SUMMIT

Substation

South Dakota

Max voltage
115
kV

SUMMIT is an electric transmission substation in South Dakota. It is classified as sub-transmission (115 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage69 kV
Voltage classSub-transmission (115 kV)
Connected lines5

Ownership & operation

Operator not catalogued for this substation.

Coordinates45.3254, -97.0541

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SUMMIT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SUMMIT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ RobertsGreenfieldSDRoberts1.0 yrs64.1
EC Near Webster ICGreenfieldSDDay1.0 yrs62.1
EC Near Webster ICGreenfieldSDDay1.0 yrs61.8
EC Near Webster ICGreenfieldSDDay1.0 yrs61.1
UNKNOWN131144Substation-AdjacentSDRoberts County230 kV300 MW3.3 yrs61.1
EC Near Webster ICGreenfieldSDDay1.0 yrs60.8
EC Near Webster ICGreenfieldSDDay1.0 yrs57.2
EC Near Webster ICGreenfieldSDDay1.0 yrs57.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.