TAP141115
SubstationPennsylvania · PECO ENERGY CO
At a glance
TAP141115 is an electric transmission substation in Pennsylvania, on PECO ENERGY CO's transmission network. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #138311 | 230 kV | PECO ENERGY CO | IN SERVICE | 1.3 mi |
| #142403 | 230 kV | PECO ENERGY CO | IN SERVICE | 2.4 mi |
| #149725 | 230 kV | PECO ENERGY CO | IN SERVICE | 0.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP141115, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| RED LION | Substation-Adjacent | DE | New Castle County | 500 kV | 1,000 MW | 1.5 yrs | 70.6 |
| KEENEY | Substation-Adjacent | DE | New Castle County | 500 kV | 1,000 MW | 1.5 yrs | 70.6 |
| CROMBY | Substation-Adjacent | PA | Montgomery County | 230 kV | 300 MW | 3.6 yrs | 69.8 |
| McKees Solar Park | Brownfield | DE | New Castle | — | 0 MW | 1.5 yrs | 69.1 |
| EDDYSTONE | Substation-Adjacent | PA | Delaware County | 230 kV | 300 MW | 3.6 yrs | 69.0 |
| UNKNOWN130225 | Substation-Adjacent | DE | Delaware County | 230 kV | 300 MW | 1.5 yrs | 68.8 |
| WHITPAIN | Substation-Adjacent | PA | Montgomery County | 500 kV | 1,000 MW | 3.6 yrs | 68.6 |
| DuPont Newport | Brownfield | DE | New Castle | — | 1 MW | 1.5 yrs | 68.4 |
Who owns the transmission lines at TAP141115?
The 3 connected lines listed above are owned by PECO ENERGY CO. Line voltages range from 230 kV to 230 kV. Their combined recorded length is about 4 miles.
How do candidate sites near TAP141115 score?
The 8 highest-scoring candidate sites within about 25 miles range from 68 to 71 on the 0–100 DC Readiness scale. They fall in New Castle County, Montgomery County, New Castle, Delaware County. The Pennsylvania average across 6,497 scored sites is 51.8. 886 of those Pennsylvania sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP141115 substation?
TAP141115 has a maximum voltage of 230 kV. That places it in the 230–344 kV band. The median named US substation in this dataset is 115 kV, so TAP141115 is above the national midpoint.
How many transmission lines connect to TAP141115 substation?
3 transmission lines terminate at or pass through TAP141115 in the HIFLD line data. The connected lines listed here run at 230 kV. Together the listed lines cover about 4 miles.
Who owns TAP141115 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP141115 belong to PECO ENERGY CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP141115 substation located?
TAP141115 is in Pennsylvania at 39.8157, -75.4328. The datacenter candidate sites closest to it are in New Castle County, Montgomery County, New Castle.
Are there datacenter candidate sites near TAP141115 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP141115. The highest-scoring is RED LION at 71/100. Across Pennsylvania, the average DC Readiness score is 51.8.
More in Pennsylvania
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP141115 substation, Pennsylvania”, https://gridcensus.com/substations/pennsylvania/tap141115-507fb57f (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP141115 substation, Pennsylvania is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.