Skip to content
Gridcensus

TAP149717

Substation

Oklahoma

Max voltage
69
kV

At a glance

TAP149717 is a 69 kV electric substation in Oklahoma, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is SEMINOLE in Seminole County, with a DC Readiness score of 61/100.

TAP149717 is an electric transmission substation in Oklahoma. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

No owner is recorded for the lines that connect here.

Coordinates34.7755, -96.5916

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#11668469 kV—IN SERVICE0.0 mi
#13497869 kV—IN SERVICE3.6 mi
#14030369 kV—IN SERVICE0.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP149717, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP149717 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SEMINOLESubstation-AdjacentOKSeminole County345 kV600 MW4.3 yrs61.0
EC Near ArbuckleGreenfieldOKMurray——4.3 yrs59.1
OZ PontotocGreenfieldOKPontotoc——4.3 yrs58.9
EC Near ArbuckleGreenfieldOKMurray——4.3 yrs58.9
OZ PontotocGreenfieldOKPontotoc——4.3 yrs58.7
EC Near Seminole (OK)GreenfieldOKSeminole——4.3 yrs58.6
EC Near Seminole (OK)GreenfieldOKSeminole——4.3 yrs57.9
EC Near Seminole (OK)GreenfieldOKSeminole——4.3 yrs57.7

How do candidate sites near TAP149717 score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 61 on the 0–100 DC Readiness scale. They fall in Seminole County, Murray, Pontotoc, Seminole. The Oklahoma average across 3,723 scored sites is 52.9. 1,344 of those Oklahoma sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP149717 substation?

TAP149717 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP149717 is below the national midpoint.

How many transmission lines connect to TAP149717 substation?

3 transmission lines terminate at or pass through TAP149717 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 4.3 miles.

Where is TAP149717 substation located?

TAP149717 is in Oklahoma at 34.7755, -96.5916. The datacenter candidate sites closest to it are in Seminole County, Murray, Pontotoc.

Are there datacenter candidate sites near TAP149717 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP149717. The highest-scoring is SEMINOLE at 61/100. Across Oklahoma, the average DC Readiness score is 52.9.

More in Oklahoma

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP149717 substation, Oklahoma”, https://gridcensus.com/substations/oklahoma/tap149717-076b6665 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP149717 substation, Oklahoma is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.