TAP149202
SubstationOklahoma · OKLAHOMA GAS & ELECTRIC CO
At a glance
TAP149202 is an electric transmission substation in Oklahoma, on OKLAHOMA GAS & ELECTRIC CO's transmission network. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #108732 | 138 kV | — | IN SERVICE | 34.6 mi |
| #147985 | 138 kV | OKLAHOMA GAS & ELECTRIC CO | IN SERVICE | 0.1 mi |
| #149241 | 138 kV | OKLAHOMA GAS & ELECTRIC CO | IN SERVICE | 0.3 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP149202, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| WOODWARD | Substation-Adjacent | OK | Woodward County | 345 kV | 600 MW | 4.3 yrs | 61.0 |
| EC Near Woodward | Greenfield | OK | Woodward | — | — | 4.3 yrs | 60.4 |
| UNKNOWN173369 | Substation-Adjacent | OK | Woodward County | 345 kV | 600 MW | 4.3 yrs | 60.2 |
| UNKNOWN159777 | Substation-Adjacent | OK | Ellis County | 345 kV | 600 MW | 4.3 yrs | 59.5 |
| UNKNOWN149217 | Substation-Adjacent | OK | Dewey County | 345 kV | 600 MW | 4.3 yrs | 59.1 |
| EC Near Woodward | Greenfield | OK | Woodward | — | — | 4.3 yrs | 58.8 |
| EC Near Woodward | Greenfield | OK | Woodward | — | — | 4.3 yrs | 58.6 |
| EC Near Woodward | Greenfield | OK | Woodward | — | — | 4.3 yrs | 58.6 |
Who owns the transmission lines at TAP149202?
The 3 connected lines listed above are owned by OKLAHOMA GAS & ELECTRIC CO. Line voltages range from 138 kV to 138 kV. Their combined recorded length is about 34.9 miles.
How do candidate sites near TAP149202 score?
The 8 highest-scoring candidate sites within about 25 miles range from 59 to 61 on the 0–100 DC Readiness scale. They fall in Woodward County, Woodward, Ellis County, Dewey County. The Oklahoma average across 3,723 scored sites is 52.9. 1,344 of those Oklahoma sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP149202 substation?
TAP149202 has a maximum voltage of 138 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP149202 is above the national midpoint.
How many transmission lines connect to TAP149202 substation?
3 transmission lines terminate at or pass through TAP149202 in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 34.9 miles.
Who owns TAP149202 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP149202 belong to OKLAHOMA GAS & ELECTRIC CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP149202 substation located?
TAP149202 is in Oklahoma at 36.4329, -99.2250. The datacenter candidate sites closest to it are in Woodward County, Woodward, Ellis County.
Are there datacenter candidate sites near TAP149202 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP149202. The highest-scoring is WOODWARD at 61/100. Across Oklahoma, the average DC Readiness score is 52.9.
More in Oklahoma
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP149202 substation, Oklahoma”, https://gridcensus.com/substations/oklahoma/tap149202-b45365dc (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP149202 substation, Oklahoma is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.