TAP148956

Substation

Oklahoma

Max voltage
69
kV

At a glance

TAP148956 is a 69 kV electric substation in Oklahoma, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is SOONER in Noble County, with a DC Readiness score of 65/100.

TAP148956 is an electric transmission substation in Oklahoma. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

No owner is recorded for the lines that connect here.

Coordinates36.8188, -97.2620

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#11176669 kV—IN SERVICE0.3 mi
#13398769 kV—IN SERVICE7.6 mi
#16987469 kV—IN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP148956, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP148956 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SOONERSubstation-AdjacentOKNoble County345 kV600 MW4.3 yrs64.9
UNKNOWN148965Substation-AdjacentOKKay County345 kV600 MW4.3 yrs61.3
UNKNOWN155853Substation-AdjacentOKKay County345 kV600 MW4.3 yrs61.2
EC Near SoonerGreenfieldOKNoble——4.3 yrs59.0
EC Near PoncaGreenfieldOKKay——4.3 yrs59.0
EC Near ConocoGreenfieldOKKay——4.3 yrs58.9
EC Near PoncaGreenfieldOKKay——4.3 yrs58.8
EC Near West 14th StreetGreenfieldKSCowley——4.3 yrs58.5

How do candidate sites near TAP148956 score?

The 8 highest-scoring candidate sites within about 25 miles range from 59 to 65 on the 0–100 DC Readiness scale. They fall in Noble County, Kay County, Noble, Kay. The Oklahoma average across 3,723 scored sites is 52.9. 1,344 of those Oklahoma sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP148956 substation?

TAP148956 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP148956 is below the national midpoint.

How many transmission lines connect to TAP148956 substation?

3 transmission lines terminate at or pass through TAP148956 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 8 miles.

Where is TAP148956 substation located?

TAP148956 is in Oklahoma at 36.8188, -97.2620. The datacenter candidate sites closest to it are in Noble County, Kay County, Noble.

Are there datacenter candidate sites near TAP148956 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP148956. The highest-scoring is SOONER at 65/100. Across Oklahoma, the average DC Readiness score is 52.9.

More in Oklahoma

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP148956 substation, Oklahoma”, https://gridcensus.com/substations/oklahoma/tap148956-ee08f4dc (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP148956 substation, Oklahoma is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.