At a glance
TAP148882 is an electric transmission substation in Oklahoma. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
No owner is recorded for the lines that connect here.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #117212 | 138 kV | — | IN SERVICE | 4.0 mi |
| #117664 | 138 kV | — | IN SERVICE | 1.6 mi |
| #138837 | 138 kV | — | IN SERVICE | 1.5 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP148882, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| SAPULPA ROAD | Substation-Adjacent | OK | Tulsa County | 345 kV | 600 MW | 4.3 yrs | 66.2 |
| TULSA NORTH (345KV) | Substation-Adjacent | OK | Tulsa County | 345 kV | 600 MW | 4.3 yrs | 66.2 |
| Guthrie Green | Brownfield | OK | Tulsa | 138 kV | — | 4.3 yrs | 66.1 |
| GREEN COUNTRY | Substation-Adjacent | OK | Tulsa County | 345 kV | 600 MW | 4.3 yrs | 66.1 |
| RIVERSIDE | Substation-Adjacent | OK | Tulsa County | 345 kV | 600 MW | 4.3 yrs | 66.0 |
| UNKNOWN149308 | Substation-Adjacent | OK | Wagoner County | 345 kV | 600 MW | 4.3 yrs | 65.8 |
| WEKIWA | Substation-Adjacent | OK | Tulsa County | 345 kV | 600 MW | 4.3 yrs | 65.7 |
| OZ Tulsa | Greenfield | OK | Tulsa | — | — | 4.3 yrs | 63.3 |
How do candidate sites near TAP148882 score?
The 8 highest-scoring candidate sites within about 25 miles range from 63 to 66 on the 0–100 DC Readiness scale. They fall in Tulsa County, Tulsa, Wagoner County. The Oklahoma average across 3,723 scored sites is 52.9. 1,344 of those Oklahoma sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP148882 substation?
TAP148882 has a maximum voltage of 138 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP148882 is above the national midpoint.
How many transmission lines connect to TAP148882 substation?
3 transmission lines terminate at or pass through TAP148882 in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 7.1 miles.
Where is TAP148882 substation located?
TAP148882 is in Oklahoma at 36.0029, -96.0655. The datacenter candidate sites closest to it are in Tulsa County, Tulsa, Wagoner County.
Are there datacenter candidate sites near TAP148882 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP148882. The highest-scoring is SAPULPA ROAD at 66/100. Across Oklahoma, the average DC Readiness score is 52.9.
More in Oklahoma
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP148882 substation, Oklahoma”, https://gridcensus.com/substations/oklahoma/tap148882-8df16711 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP148882 substation, Oklahoma is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.