Skip to content
Gridcensus

TAP153882

Substation

Ohio

Max voltage
69
kV

TAP153882 is an electric transmission substation in Ohio. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateOhio
Coordinates39.7856, -84.0497

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP153882, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP153882 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN112844Substation-AdjacentOHWarren County345 kV600 MW5.2 yrs67.3
TODHUNTER SUBSTATIONSubstation-AdjacentOHButler County345 kV600 MW5.2 yrs67.0
SUGAR CREEKSubstation-AdjacentOHGreene County345 kV600 MW5.2 yrs66.9
Mound Plant (USDOE)BrownfieldOHMontgomery69 kV—5.2 yrs66.6
GREENESubstation-AdjacentOHGreene County345 kV600 MW5.2 yrs66.5
O. H. HUTCHINGS STATIONSubstation-AdjacentOHMontgomery County138 kV100 MW5.2 yrs65.9
EC Coal Butler CountyGreenfieldOHButler County——5.2 yrs65.2
BATHSubstation-AdjacentOHGreene County345 kV600 MW5.2 yrs65.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP153882 substation, Ohio is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.