Skip to content
Gridcensus

SHELBY

Substation

Ohio

Max voltage
345
kV

SHELBY is an electric transmission substation in Ohio. It is classified as high-voltage (345 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines5

Ownership & operation

Operator not catalogued for this substation.

StateOhio
Coordinates40.2886, -84.0862

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SHELBY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SHELBY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MIAMISubstation-AdjacentOHMiami County345 kV600 MW3.8 yrs63.3
WEST MILTONSubstation-AdjacentOHMiami County345 kV600 MW3.8 yrs62.7
SOUTHWEST LIMASubstation-AdjacentOHAllen County345 kV600 MW3.8 yrs62.6
SHELBYSubstation-AdjacentOHShelby County345 kV600 MW3.8 yrs61.1
OZ ClarkGreenfieldOHClark——3.2 yrs59.2
OZ ClarkGreenfieldOHClark——3.2 yrs59.1
EC Near Piqua Power PlantGreenfieldOHMiami——3.2 yrs58.7
EC Near Arcanum PeakingGreenfieldOHDarke——3.2 yrs58.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SHELBY substation, Ohio. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.