Skip to content
Gridcensus

ADKINS

Substation

Ohio

Max voltage
345
kV

ADKINS is an electric transmission substation in Ohio. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateOhio
Coordinates39.7123, -83.1776

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ADKINS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ADKINS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HAYDENSubstation-AdjacentOHFranklin County345 kV600 MW3.8 yrs67.8
UNKNOWN113629Substation-AdjacentOHFranklin County345 kV600 MW3.8 yrs67.7
OZ FranklinGreenfieldOHFranklin3.2 yrs66.4
OZ FranklinGreenfieldOHFranklin3.2 yrs66.2
BIXBYSubstation-AdjacentOHFranklin County345 kV600 MW3.8 yrs66.1
UNKNOWN113602Substation-AdjacentOHFranklin County345 kV600 MW3.8 yrs65.7
OZ FranklinGreenfieldOHFranklin3.2 yrs65.5
OZ FranklinGreenfieldOHFranklin3.2 yrs65.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ADKINS substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.