Skip to content
Gridcensus

TAP166988

Substation

North Dakota · OTTER TAIL POWER CO

Max voltage
69
kV

At a glance

TAP166988 is a 69 kV electric substation in North Dakota on OTTER TAIL POWER CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is MAPLE RIVER in Cass County, with a DC Readiness score of 67/100.

TAP166988 is an electric transmission substation in North Dakota, on OTTER TAIL POWER CO's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Line owner (most lines)OTTER TAIL POWER CO
Coordinates47.1357, -96.8355

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#13722469 kVOTTER TAIL POWER COIN SERVICE7.0 mi
#16767969 kV—IN SERVICE17.4 mi
#16818469 kVOTTER TAIL POWER COIN SERVICE11.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP166988, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP166988 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MAPLE RIVERSubstation-AdjacentNDCass County345 kV600 MW4.3 yrs67.1
SHEYENNESubstation-AdjacentNDClay County230 kV300 MW4.3 yrs66.4
BISONSubstation-AdjacentNDCass County345 kV600 MW4.3 yrs66.0
FRONTIERSubstation-AdjacentNDClay County230 kV300 MW4.3 yrs65.4
MOORHEADSubstation-AdjacentMNClay County230 kV300 MW4.3 yrs65.1
OZ CassGreenfieldNDCass——4.3 yrs65.1
FARGOSubstation-AdjacentNDCass County230 kV300 MW4.3 yrs65.0
OZ CassGreenfieldNDCass——4.3 yrs64.7

Who owns the transmission lines at TAP166988?

The 3 connected lines listed above are owned by OTTER TAIL POWER CO. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 35.8 miles.

How do candidate sites near TAP166988 score?

The 8 highest-scoring candidate sites within about 25 miles range from 65 to 67 on the 0–100 DC Readiness scale. They fall in Cass County, Clay County, Cass. The North Dakota average across 1,020 scored sites is 55.7. 453 of those North Dakota sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP166988 substation?

TAP166988 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP166988 is below the national midpoint.

How many transmission lines connect to TAP166988 substation?

3 transmission lines terminate at or pass through TAP166988 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 35.8 miles.

Who owns TAP166988 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP166988 belong to OTTER TAIL POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP166988 substation located?

TAP166988 is in North Dakota at 47.1357, -96.8355. The datacenter candidate sites closest to it are in Cass County, Clay County, Cass.

Are there datacenter candidate sites near TAP166988 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP166988. The highest-scoring is MAPLE RIVER at 67/100. Across North Dakota, the average DC Readiness score is 55.7.

More in North Dakota

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP166988 substation, North Dakota”, https://gridcensus.com/substations/north-dakota/tap166988-dae71d7f (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP166988 substation, North Dakota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.