TAP160832
SubstationNorth Dakota · OTTER TAIL POWER CO
At a glance
TAP160832 is an electric transmission substation in North Dakota, on OTTER TAIL POWER CO's transmission network. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #139939 | 42 kV | OTTER TAIL POWER CO | — | 23.2 mi |
| #165513 | 42 kV | OTTER TAIL POWER CO | IN SERVICE | 5.0 mi |
| #165514 | 42 kV | OTTER TAIL POWER CO | IN SERVICE | 0.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP160832, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| EC Coal Cavalier County | Greenfield | ND | Cavalier County | — | — | 4.3 yrs | 59.1 |
| UNKNOWN134241 | Substation-Adjacent | ND | Ramsey County | 115 kV | 100 MW | 4.3 yrs | 58.4 |
| LAKOTA | Substation-Adjacent | ND | Nelson County | 115 kV | 100 MW | 4.3 yrs | 58.4 |
| UNKNOWN134103 | Substation-Adjacent | ND | Cavalier County | 115 kV | 100 MW | 4.3 yrs | 57.7 |
| UNKNOWN134101 | Substation-Adjacent | ND | Cavalier County | 115 kV | 100 MW | 4.3 yrs | 57.7 |
| UNKNOWN134102 | Substation-Adjacent | ND | Cavalier County | 115 kV | 100 MW | 4.3 yrs | 57.6 |
| UNKNOWN134096 | Substation-Adjacent | ND | Cavalier County | 115 kV | 100 MW | 4.3 yrs | 57.6 |
| UNKNOWN134080 | Substation-Adjacent | ND | Cavalier County | 115 kV | 100 MW | 4.3 yrs | 57.5 |
Who owns the transmission lines at TAP160832?
The 3 connected lines listed above are owned by OTTER TAIL POWER CO. Line voltages range from 42 kV to 42 kV. Their combined recorded length is about 28.3 miles.
How do candidate sites near TAP160832 score?
The 8 highest-scoring candidate sites within about 25 miles range from 58 to 59 on the 0–100 DC Readiness scale. They fall in Cavalier County, Ramsey County, Nelson County. The North Dakota average across 1,020 scored sites is 55.7. 453 of those North Dakota sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
How many transmission lines connect to TAP160832 substation?
3 transmission lines terminate at or pass through TAP160832 in the HIFLD line data. The connected lines listed here run at 42 kV. Together the listed lines cover about 28.3 miles.
Who owns TAP160832 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP160832 belong to OTTER TAIL POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP160832 substation located?
TAP160832 is in North Dakota at 48.4137, -98.3832. The datacenter candidate sites closest to it are in Cavalier County, Ramsey County, Nelson County.
Are there datacenter candidate sites near TAP160832 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP160832. The highest-scoring is EC Coal Cavalier County at 59/100. Across North Dakota, the average DC Readiness score is 55.7.
More in North Dakota
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP160832 substation, North Dakota”, https://gridcensus.com/substations/north-dakota/tap160832-653ea424 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP160832 substation, North Dakota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.