TAP160813

Substation

North Dakota

Max voltage
—
kV

TAP160813 is an electric transmission substation in North Dakota. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates47.0953, -98.1939

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP160813, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP160813 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN133388Substation-AdjacentNDSteele County230 kV300 MW4.3 yrs62.7
UNKNOWN135379Substation-AdjacentNDSteele County230 kV300 MW4.3 yrs62.4
UNKNOWN133389Substation-AdjacentNDBarnes County230 kV300 MW4.3 yrs62.3
OZ BarnesGreenfieldNDBarnes——4.3 yrs61.6
VALLEY CITYSubstation-AdjacentNDBarnes County115 kV100 MW4.3 yrs58.4
UNKNOWN135159Substation-AdjacentNDBarnes County115 kV100 MW4.3 yrs58.4
UNKNOWN135244Substation-AdjacentNDBarnes County115 kV100 MW4.3 yrs57.7
UNKNOWN160691Substation-AdjacentNDStutsman County115 kV100 MW4.3 yrs57.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP160813 substation, North Dakota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.