Skip to content
Gridcensus

TAP160780

Substation

North Dakota · OTTER TAIL POWER CO

Max voltage
—
kV

At a glance

TAP160780 is an electric substation in North Dakota on OTTER TAIL POWER CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is BUFFALO in Cass County, with a DC Readiness score of 64/100.

TAP160780 is an electric transmission substation in North Dakota, on OTTER TAIL POWER CO's transmission network. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership

Line owner (most lines)OTTER TAIL POWER CO
Coordinates46.8911, -97.7888

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#12881942 kVOTTER TAIL POWER COIN SERVICE8.8 mi
#16541342 kVOTTER TAIL POWER COIN SERVICE0.0 mi
#16541442 kVOTTER TAIL POWER COIN SERVICE13.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP160780, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP160780 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BUFFALOSubstation-AdjacentNDCass County345 kV600 MW4.3 yrs63.5
UNKNOWN133388Substation-AdjacentNDSteele County230 kV300 MW4.3 yrs62.7
UNKNOWN133389Substation-AdjacentNDBarnes County230 kV300 MW4.3 yrs62.3
OZ BarnesGreenfieldNDBarnes——4.3 yrs61.6
UNKNOWN135014Substation-AdjacentNDRansom County115 kV100 MW4.3 yrs58.5
UNKNOWN135159Substation-AdjacentNDBarnes County115 kV100 MW4.3 yrs58.4
VALLEY CITYSubstation-AdjacentNDBarnes County115 kV100 MW4.3 yrs58.4
UNKNOWN135019Substation-AdjacentNDRansom County115 kV100 MW4.3 yrs58.3

Who owns the transmission lines at TAP160780?

The 3 connected lines listed above are owned by OTTER TAIL POWER CO. Line voltages range from 42 kV to 42 kV. Their combined recorded length is about 22 miles.

How do candidate sites near TAP160780 score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 64 on the 0–100 DC Readiness scale. They fall in Cass County, Steele County, Barnes County, Barnes. The North Dakota average across 1,020 scored sites is 55.7. 453 of those North Dakota sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP160780 substation?

3 transmission lines terminate at or pass through TAP160780 in the HIFLD line data. The connected lines listed here run at 42 kV. Together the listed lines cover about 22 miles.

Who owns TAP160780 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP160780 belong to OTTER TAIL POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP160780 substation located?

TAP160780 is in North Dakota at 46.8911, -97.7888. The datacenter candidate sites closest to it are in Cass County, Steele County, Barnes County.

Are there datacenter candidate sites near TAP160780 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP160780. The highest-scoring is BUFFALO at 64/100. Across North Dakota, the average DC Readiness score is 55.7.

More in North Dakota

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP160780 substation, North Dakota”, https://gridcensus.com/substations/north-dakota/tap160780-51f0334b (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP160780 substation, North Dakota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.