TAP160626

Substation

North Dakota · MONTANA-DAKOTA UTILITIES CO

Max voltage
—
kV

At a glance

TAP160626 is an electric substation in North Dakota on MONTANA-DAKOTA UTILITIES CO's transmission network, recorded in the HIFLD transmission dataset. 2 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN156789 in McKenzie County, with a DC Readiness score of 63/100.

TAP160626 is an electric transmission substation in North Dakota, on MONTANA-DAKOTA UTILITIES CO's transmission network. It is classified as unclassified and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines2

Ownership

Line owner (most lines)MONTANA-DAKOTA UTILITIES CO
Coordinates47.9346, -103.2827

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#165335115 kVMONTANA-DAKOTA UTILITIES COIN SERVICE1.7 mi
#165336115 kVMONTANA-DAKOTA UTILITIES COIN SERVICE7.0 mi
#178202115 kVMONTANA-DAKOTA UTILITIES CO—3.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP160626, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP160626 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN156789Substation-AdjacentNDMcKenzie County345 kV600 MW4.3 yrs63.0
UNKNOWN160717Substation-AdjacentNDMcKenzie County345 kV600 MW4.3 yrs61.2
EC Near WillistonGreenfieldNDWilliams——4.3 yrs60.4
EC Near WillistonGreenfieldNDWilliams——4.3 yrs60.2
EC Near WillistonGreenfieldNDWilliams——4.3 yrs59.9
EC Near WillistonGreenfieldNDWilliams——4.3 yrs59.9
EC Near WillistonGreenfieldNDWilliams——4.3 yrs59.7
WATFORD CITYSubstation-AdjacentNDMcKenzie County230 kV300 MW4.3 yrs59.3

Who owns the transmission lines at TAP160626?

The 3 connected lines listed above are owned by MONTANA-DAKOTA UTILITIES CO. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 11.9 miles.

How do candidate sites near TAP160626 score?

The 8 highest-scoring candidate sites within about 25 miles range from 59 to 63 on the 0–100 DC Readiness scale. They fall in McKenzie County, Williams. The North Dakota average across 1,020 scored sites is 55.7. 453 of those North Dakota sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP160626 substation?

2 transmission lines terminate at or pass through TAP160626 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 11.9 miles.

Who owns TAP160626 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP160626 belong to MONTANA-DAKOTA UTILITIES CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP160626 substation located?

TAP160626 is in North Dakota at 47.9346, -103.2827. The datacenter candidate sites closest to it are in McKenzie County, Williams.

Are there datacenter candidate sites near TAP160626 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP160626. The highest-scoring is UNKNOWN156789 at 63/100. Across North Dakota, the average DC Readiness score is 55.7.

More in North Dakota

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP160626 substation, North Dakota”, https://gridcensus.com/substations/north-dakota/tap160626-9a14dd5d (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP160626 substation, North Dakota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.