Skip to content
Gridcensus

TAP134443

Substation

North Dakota · MONTANA-DAKOTA UTILITIES CO

Max voltage
115
kV

At a glance

TAP134443 is a 115 kV electric substation in North Dakota on MONTANA-DAKOTA UTILITIES CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is NESET in Mountrail County, with a DC Readiness score of 63/100.

TAP134443 is an electric transmission substation in North Dakota, on MONTANA-DAKOTA UTILITIES CO's transmission network. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership

Line owner (most lines)MONTANA-DAKOTA UTILITIES CO
Coordinates48.4028, -102.9082

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#106355115 kVMONTANA-DAKOTA UTILITIES COIN SERVICE4.3 mi
#115819115 kVMONTANA-DAKOTA UTILITIES COIN SERVICE0.2 mi
#119144115 kVMONTANA-DAKOTA UTILITIES COIN SERVICE2.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP134443, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP134443 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NESETSubstation-AdjacentNDMountrail County230 kV300 MW4.3 yrs62.7
UNKNOWN131051Substation-AdjacentNDWilliams County230 kV300 MW4.3 yrs62.5
EC Near WillistonGreenfieldNDWilliams——4.3 yrs60.4
EC Near WillistonGreenfieldNDWilliams——4.3 yrs60.2
EC Near WillistonGreenfieldNDWilliams——4.3 yrs59.9
EC Near WillistonGreenfieldNDWilliams——4.3 yrs59.9
EC Near WillistonGreenfieldNDWilliams——4.3 yrs59.7
UNKNOWN134456Substation-AdjacentNDWilliams County115 kV100 MW4.3 yrs58.5

Who owns the transmission lines at TAP134443?

The 3 connected lines listed above are owned by MONTANA-DAKOTA UTILITIES CO. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 7.1 miles.

How do candidate sites near TAP134443 score?

The 8 highest-scoring candidate sites within about 25 miles range from 59 to 63 on the 0–100 DC Readiness scale. They fall in Mountrail County, Williams County, Williams. The North Dakota average across 1,020 scored sites is 55.7. 453 of those North Dakota sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP134443 substation?

TAP134443 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP134443 is at the national midpoint.

How many transmission lines connect to TAP134443 substation?

3 transmission lines terminate at or pass through TAP134443 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 7.1 miles.

Who owns TAP134443 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP134443 belong to MONTANA-DAKOTA UTILITIES CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP134443 substation located?

TAP134443 is in North Dakota at 48.4028, -102.9082. The datacenter candidate sites closest to it are in Mountrail County, Williams County, Williams.

Are there datacenter candidate sites near TAP134443 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP134443. The highest-scoring is NESET at 63/100. Across North Dakota, the average DC Readiness score is 55.7.

More in North Dakota

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP134443 substation, North Dakota”, https://gridcensus.com/substations/north-dakota/tap134443-c8765f9f (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP134443 substation, North Dakota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.