TAP133969
SubstationNorth Dakota · OTTER TAIL POWER CO
At a glance
TAP133969 is an electric transmission substation in North Dakota, on OTTER TAIL POWER CO's transmission network. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #104050 | 42 kV | OTTER TAIL POWER CO | IN SERVICE | 25.3 mi |
| #142991 | 42 kV | OTTER TAIL POWER CO | IN SERVICE | 9.6 mi |
| #176916 | 42 kV | OTTER TAIL POWER CO | IN SERVICE | 9.4 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP133969, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN133143 | Substation-Adjacent | ND | McLean County | 230 kV | 300 MW | 4.3 yrs | 62.9 |
| MCHENRY | Substation-Adjacent | ND | McHenry County | 230 kV | 300 MW | 4.3 yrs | 62.0 |
| UNKNOWN132680 | Substation-Adjacent | ND | Ward County | 230 kV | 300 MW | 4.3 yrs | 61.8 |
| EC Near Coal Creek | Greenfield | ND | McLean | — | — | 4.3 yrs | 59.6 |
| EC Near Coal Creek | Greenfield | ND | McLean | — | — | 4.3 yrs | 59.1 |
| UNKNOWN134174 | Substation-Adjacent | ND | McLean County | 115 kV | 100 MW | 4.3 yrs | 58.5 |
| UNKNOWN158084 | Substation-Adjacent | ND | McLean County | 115 kV | 100 MW | 4.3 yrs | 58.5 |
| UNKNOWN133965 | Substation-Adjacent | ND | McLean County | 115 kV | 100 MW | 4.3 yrs | 57.7 |
Who owns the transmission lines at TAP133969?
The 3 connected lines listed above are owned by OTTER TAIL POWER CO. Line voltages range from 42 kV to 42 kV. Their combined recorded length is about 44.3 miles.
How do candidate sites near TAP133969 score?
The 8 highest-scoring candidate sites within about 25 miles range from 58 to 63 on the 0–100 DC Readiness scale. They fall in McLean County, McHenry County, Ward County, McLean. The North Dakota average across 1,020 scored sites is 55.7. 453 of those North Dakota sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP133969 substation?
TAP133969 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP133969 is at the national midpoint.
How many transmission lines connect to TAP133969 substation?
3 transmission lines terminate at or pass through TAP133969 in the HIFLD line data. The connected lines listed here run at 42 kV. Together the listed lines cover about 44.3 miles.
Who owns TAP133969 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP133969 belong to OTTER TAIL POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP133969 substation located?
TAP133969 is in North Dakota at 47.8189, -101.2826. The datacenter candidate sites closest to it are in McLean County, McHenry County, Ward County.
Are there datacenter candidate sites near TAP133969 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP133969. The highest-scoring is UNKNOWN133143 at 63/100. Across North Dakota, the average DC Readiness score is 55.7.
More in North Dakota
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP133969 substation, North Dakota”, https://gridcensus.com/substations/north-dakota/tap133969-cf2eaf86 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP133969 substation, North Dakota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.