Skip to content
Gridcensus

WOODLEAF SWITCHING STATION

Substation

North Carolina

Max voltage
500
kV

WOODLEAF SWITCHING STATION is an electric transmission substation in North Carolina. It is classified as extra-high-voltage (500 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage230 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.7232, -80.6012

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WOODLEAF SWITCHING STATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WOODLEAF SWITCHING STATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN112337Substation-AdjacentNCMecklenburg County230 kV300 MW3.8 yrs67.4
MCGUIRESubstation-AdjacentNCMecklenburg County500 kV1,000 MW3.8 yrs66.9
WOODLEAF SWITCHING STATIONSubstation-AdjacentNCRowan County500 kV1,000 MW3.8 yrs65.6
UNKNOWN114701Substation-AdjacentNCRowan County230 kV300 MW3.8 yrs64.6
UNKNOWN114253Substation-AdjacentNCMecklenburg County230 kV300 MW3.8 yrs63.2
UNKNOWN114573Substation-AdjacentNCCabarrus County230 kV300 MW3.8 yrs63.0
OZ CabarrusGreenfieldNCCabarrus——4.3 yrs61.8
OZ RowanGreenfieldNCRowan——4.3 yrs60.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WOODLEAF SWITCHING STATION substation, North Carolina. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.