TAP151700

Substation

North Carolina

Max voltage
100
kV

TAP151700 is an electric transmission substation in North Carolina. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.2378, -81.1666

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP151700, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP151700 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NEWPORT TIESubstation-AdjacentSCYork County500 kV1,000 MW3.9 yrs71.6
SediverBrownfieldSCYork County—520 MW3.9 yrs70.6
ALLENSubstation-AdjacentNCMecklenburg County230 kV300 MW5.3 yrs69.9
MCGUIRESubstation-AdjacentNCMecklenburg County500 kV1,000 MW5.3 yrs69.8
UNKNOWN112337Substation-AdjacentNCMecklenburg County230 kV300 MW5.3 yrs69.2
UNKNOWN133860Substation-AdjacentNCCherokee County230 kV300 MW5.3 yrs68.0
WOODLAWNSubstation-AdjacentNCMecklenburg County230 kV300 MW5.3 yrs67.3
UNKNOWN114635Substation-AdjacentNCMecklenburg County230 kV300 MW5.3 yrs67.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP151700 substation, North Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.