RISER167286
SubstationNew Hampshire · PUBLIC SERVICE CO OF NH
At a glance
RISER167286 is an electric transmission substation in New Hampshire, on PUBLIC SERVICE CO OF NH's transmission network. It is classified as unclassified and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #166591 | — | PUBLIC SERVICE CO OF NH | — | 12.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of RISER167286, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN132754 | Substation-Adjacent | NH | Coos County | 115 kV | 100 MW | 4.3 yrs | 57.3 |
| UNKNOWN137038 | Substation-Adjacent | NH | Coos County | 115 kV | 100 MW | 4.3 yrs | 57.3 |
| TAP137033 | Substation-Adjacent | NH | Coos County | 115 kV | 100 MW | 4.3 yrs | 57.1 |
| UNKNOWN137036 | Substation-Adjacent | NH | Coos County | 115 kV | 100 MW | 4.3 yrs | 57.0 |
| UNKNOWN137022 | Substation-Adjacent | NH | Coos County | 115 kV | 100 MW | 4.3 yrs | 57.0 |
| UNKNOWN137035 | Substation-Adjacent | NH | Coos County | 115 kV | 100 MW | 4.3 yrs | 56.7 |
| OZ Coos | Greenfield | NH | Coos | — | — | 4.3 yrs | 53.6 |
| OZ Coos | Greenfield | NH | Coos | — | — | 4.3 yrs | 53.3 |
Who owns the transmission lines at RISER167286?
The 1 connected line listed above is owned by PUBLIC SERVICE CO OF NH. Their combined recorded length is about 12 miles.
How do candidate sites near RISER167286 score?
The 8 highest-scoring candidate sites within about 25 miles range from 53 to 57 on the 0–100 DC Readiness scale. They fall in Coos County, Coos. The New Hampshire average across 539 scored sites is 54.5. 83 of those New Hampshire sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
How many transmission lines connect to RISER167286 substation?
1 transmission line terminate at or pass through RISER167286 in the HIFLD line data. Together the listed lines cover about 12 miles.
Who owns RISER167286 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at RISER167286 belong to PUBLIC SERVICE CO OF NH. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is RISER167286 substation located?
RISER167286 is in New Hampshire at 44.8320, -71.3294. The datacenter candidate sites closest to it are in Coos County, Coos.
Are there datacenter candidate sites near RISER167286 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of RISER167286. The highest-scoring is UNKNOWN132754 at 57/100. Across New Hampshire, the average DC Readiness score is 54.5.
More in New Hampshire
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “RISER167286 substation, New Hampshire”, https://gridcensus.com/substations/new-hampshire/riser167286-3f746e01 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for RISER167286 substation, New Hampshire is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.