Skip to content
Gridcensus

BIG TIMBER AUTO

Substation

Montana

Max voltage
115
kV

BIG TIMBER AUTO is an electric transmission substation in Montana. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage69 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

Operator not catalogued for this substation.

StateMontana
Coordinates45.8713, -109.9386

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BIG TIMBER AUTO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BIG TIMBER AUTO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN202080Substation-AdjacentMTSweet Grass County115 kV100 MW1.1 yrs60.0
BIG TIMBER AUTOSubstation-AdjacentMTSweet Grass County115 kV100 MW1.1 yrs60.0
UNKNOWN204533Substation-AdjacentMTSweet Grass County115 kV100 MW1.1 yrs59.6
BIG TIMBER CITYSubstation-AdjacentMTSweet Grass County69 kV50 MW1.1 yrs58.2
UNKNOWN208538Substation-AdjacentMTSweet Grass County69 kV50 MW1.1 yrs58.2
TAP208540Substation-AdjacentMTSweet Grass County69 kV50 MW1.1 yrs58.1
UNKNOWN208548Substation-AdjacentMTSweet Grass County69 kV50 MW1.1 yrs57.8
REED POINTSubstation-AdjacentMTStillwater County69 kV50 MW1.1 yrs56.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for BIG TIMBER AUTO substation, Montana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.