TAP144800 is an electric transmission substation in Mississippi. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates34.1553, -88.7259

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP144800, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP144800 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PLEASANT HILLSubstation-AdjacentMSUnion County500 kV1,000 MW2.8 yrs63.1
UNIONSubstation-AdjacentMSUnion County500 kV1,000 MW2.8 yrs62.3
OZ LeeGreenfieldMSLee1.4 yrs61.5
OZ LeeGreenfieldMSLee1.4 yrs59.6
OZ LeeGreenfieldMSLee1.4 yrs59.3
OZ UnionGreenfieldMSUnion1.4 yrs58.8
EC Coal Monroe CountyGreenfieldMSMonroe County1.4 yrs58.6
OZ ChickasawGreenfieldMSChickasaw1.4 yrs57.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP144800 substation, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.