Skip to content
Gridcensus

TAP144752

Substation

Mississippi · MISSISSIPPI POWER CO

Max voltage
69
kV

At a glance

TAP144752 is a 69 kV electric substation in Mississippi on MISSISSIPPI POWER CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN109552 in Clarke County, with a DC Readiness score of 62/100.

TAP144752 is an electric transmission substation in Mississippi, on MISSISSIPPI POWER CO's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Line owner (most lines)MISSISSIPPI POWER CO
Coordinates31.9679, -89.1066

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#11828469 kVMISSISSIPPI POWER COIN SERVICE6.6 mi
#14333569 kVMISSISSIPPI POWER COIN SERVICE0.0 mi
#14755169 kVMISSISSIPPI POWER COIN SERVICE4.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP144752, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP144752 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN109552Substation-AdjacentMSClarke County230 kV300 MW3.9 yrs61.9
UNKNOWN109611Substation-AdjacentMSJones County230 kV300 MW3.9 yrs61.3
UNKNOWN109540Substation-AdjacentMSLauderdale County230 kV300 MW3.9 yrs61.2
EC Near PauldingGreenfieldMSJasper——3.9 yrs59.0
OZ JonesGreenfieldMSJones——3.9 yrs58.9
EC Near SweattGreenfieldMSLauderdale——3.9 yrs58.6
EC Near PauldingGreenfieldMSJasper——3.9 yrs58.4
UNKNOWN109392Substation-AdjacentMSSmith County115 kV100 MW3.9 yrs58.0

Who owns the transmission lines at TAP144752?

The 3 connected lines listed above are owned by MISSISSIPPI POWER CO. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 11.2 miles.

How do candidate sites near TAP144752 score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 62 on the 0–100 DC Readiness scale. They fall in Clarke County, Jones County, Lauderdale County, Jasper. The Mississippi average across 3,104 scored sites is 53. 694 of those Mississippi sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP144752 substation?

TAP144752 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP144752 is below the national midpoint.

How many transmission lines connect to TAP144752 substation?

3 transmission lines terminate at or pass through TAP144752 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 11.2 miles.

Who owns TAP144752 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP144752 belong to MISSISSIPPI POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP144752 substation located?

TAP144752 is in Mississippi at 31.9679, -89.1066. The datacenter candidate sites closest to it are in Clarke County, Jones County, Lauderdale County.

Are there datacenter candidate sites near TAP144752 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP144752. The highest-scoring is UNKNOWN109552 at 62/100. Across Mississippi, the average DC Readiness score is 53.

More in Mississippi

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP144752 substation, Mississippi”, https://gridcensus.com/substations/mississippi/tap144752-5cddfd57 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP144752 substation, Mississippi is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.