SAWMILL ROAD

Substation

Mississippi

Max voltage
69
kV

SAWMILL ROAD is an electric transmission substation in Mississippi. It is classified as distribution (69–115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines1

Ownership & operation

Operator not catalogued for this substation.

Coordinates31.0049, -88.5193

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SAWMILL ROAD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SAWMILL ROAD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BIG CREEKSubstation-AdjacentALMobile County500 kV1,000 MW3.9 yrs65.5
UNKNOWN110319Substation-AdjacentMSJackson County230 kV300 MW3.9 yrs61.6
BENNDALE 230Substation-AdjacentMSGeorge County230 kV300 MW3.9 yrs61.3
NORTH MOBILESubstation-AdjacentALMobile County230 kV300 MW3.9 yrs61.3
SOUTHEAST GREENESubstation-AdjacentMSGeorge County230 kV300 MW3.9 yrs61.3
UNKNOWN109077Substation-AdjacentALMobile County230 kV300 MW3.9 yrs61.2
UNKNOWN109085Substation-AdjacentALMobile County230 kV300 MW3.9 yrs61.2
EC Near BenndaleGreenfieldMSGeorge——3.9 yrs60.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for SAWMILL ROAD substation, Mississippi is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.