NEW ALBANY
SubstationMississippi · TENNESSEE VALLEY AUTHORITY
At a glance
NEW ALBANY is an electric transmission substation in Mississippi, on TENNESSEE VALLEY AUTHORITY's transmission network. It is classified as sub-transmission (138 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #100110 | 161 kV | TENNESSEE VALLEY AUTHORITY | IN SERVICE | 8.8 mi |
| #110006 | 161 kV | TENNESSEE VALLEY AUTHORITY | IN SERVICE | 18.2 mi |
| #128064 | 161 kV | TENNESSEE VALLEY AUTHORITY | IN SERVICE | 9.4 mi |
| #135511 | 161 kV | TENNESSEE VALLEY AUTHORITY | IN SERVICE | 1.9 mi |
| #133379 | — | TENNESSEE VALLEY AUTHORITY | IN SERVICE | 7.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of NEW ALBANY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| PLEASANT HILL | Substation-Adjacent | MS | Union County | 500 kV | 1,000 MW | 3.9 yrs | 66.9 |
| UNION | Substation-Adjacent | MS | Union County | 500 kV | 1,000 MW | 3.9 yrs | 66.2 |
| BENTON | Substation-Adjacent | MS | Benton County | 500 kV | 1,000 MW | 3.9 yrs | 65.3 |
| OZ Lee | Greenfield | MS | Lee | — | — | 3.9 yrs | 61.1 |
| NEW ALBANY | Substation-Adjacent | MS | Union County | 161 kV | 100 MW | 3.9 yrs | 59.2 |
| TAP144803 | Substation-Adjacent | MS | Lee County | 161 kV | 100 MW | 3.9 yrs | 59.2 |
| N. HAVEN | Substation-Adjacent | MS | Union County | 161 kV | 100 MW | 3.9 yrs | 59.2 |
| N. SHANNON | Substation-Adjacent | MS | Lee County | 161 kV | 100 MW | 3.9 yrs | 59.2 |
How does NEW ALBANY compare with other substations in Mississippi?
Mississippi has 1,204 substation records in HIFLD, of which 163 carry a station name; the rest are unnamed tap points, risers and line ends. 109 named substations in the state are in NEW ALBANY's 115–229 kV band (67% of named stations). 42 sit in a higher band. 18 named substations in Mississippi operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 161 kV.
Who owns the transmission lines at NEW ALBANY?
The 5 connected lines listed above are owned by TENNESSEE VALLEY AUTHORITY. Line voltages range from 161 kV to 161 kV. Their combined recorded length is about 45.3 miles.
How do candidate sites near NEW ALBANY score?
The 8 highest-scoring candidate sites within about 25 miles range from 59 to 67 on the 0–100 DC Readiness scale. They fall in Union County, Benton County, Lee, Lee County. The Mississippi average across 3,104 scored sites is 53. 694 of those Mississippi sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is NEW ALBANY substation?
NEW ALBANY has a maximum voltage of 161 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so NEW ALBANY is above the national midpoint.
How many transmission lines connect to NEW ALBANY substation?
5 transmission lines terminate at or pass through NEW ALBANY in the HIFLD line data. The connected lines listed here run at 161 kV. Together the listed lines cover about 45.3 miles.
Who owns NEW ALBANY substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at NEW ALBANY belong to TENNESSEE VALLEY AUTHORITY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is NEW ALBANY substation located?
NEW ALBANY is in Mississippi at 34.4827, -88.9923. The datacenter candidate sites closest to it are in Union County, Benton County, Lee.
Are there datacenter candidate sites near NEW ALBANY substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of NEW ALBANY. The highest-scoring is PLEASANT HILL at 67/100. Across Mississippi, the average DC Readiness score is 53.
Other 161 kV substations in Mississippi
- TUPELO· 10 lines
- STURGIS· 7 lines
- DE KALB· 6 lines
- PHILADELPHIA· 6 lines
- STATELINE· 6 lines
- BOONEVILLE· 5 lines
- LEAKE· 5 lines
- OKOLONA· 5 lines
- All named substations in Mississippi· 163 stations
- Datacenter candidate sites in Mississippi· 3,104 sites
- Brownfield and retired plant sites in Mississippi
- Substations by state
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “NEW ALBANY substation, Mississippi”, https://gridcensus.com/substations/mississippi/new-albany-1c06c523 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for NEW ALBANY substation, Mississippi is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.