TAP139169

Substation

Maryland

Max voltage
115
kV

At a glance

TAP139169 is a 115 kV electric substation in Maryland, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is WAUGH CHAPEL in Anne Arundel County, with a DC Readiness score of 68/100.

TAP139169 is an electric transmission substation in Maryland. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership

No owner is recorded for the lines that connect here.

Coordinates39.1031, -76.7684

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP139169, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP139169 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WAUGH CHAPELSubstation-AdjacentMDAnne Arundel County500 kV1,000 MW5.3 yrs67.5
BURCHES HILLSubstation-AdjacentMDPrince George's County500 kV1,000 MW5.3 yrs66.9
BRIGHTONSubstation-AdjacentMDHoward County500 kV1,000 MW5.3 yrs66.8
CIASubstation-AdjacentVAFalls Church city230 kV300 MW5.1 yrs65.6
TAP139314Substation-AdjacentVAAlexandria city230 kV300 MW5.1 yrs65.6
POTOMAC YARDSubstation-AdjacentVAAlexandria city230 kV300 MW5.1 yrs65.5
NORTH ALEXANDRIASubstation-AdjacentVAAlexandria city230 kV300 MW5.1 yrs65.4
FALLS CHURCHSubstation-AdjacentVAFalls Church city230 kV300 MW5.1 yrs65.3

How do candidate sites near TAP139169 score?

The 8 highest-scoring candidate sites within about 25 miles range from 65 to 68 on the 0–100 DC Readiness scale. They fall in Anne Arundel County, Prince George's County, Howard County, Falls Church city. The Maryland average across 1,031 scored sites is 52.9. 314 of those Maryland sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP139169 substation?

TAP139169 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP139169 is at the national midpoint.

How many transmission lines connect to TAP139169 substation?

3 transmission lines terminate at or pass through TAP139169 in the HIFLD line data.

Where is TAP139169 substation located?

TAP139169 is in Maryland at 39.1031, -76.7684. The datacenter candidate sites closest to it are in Anne Arundel County, Prince George's County, Howard County.

Are there datacenter candidate sites near TAP139169 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP139169. The highest-scoring is WAUGH CHAPEL at 68/100. Across Maryland, the average DC Readiness score is 52.9.

More in Maryland

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP139169 substation, Maryland”, https://gridcensus.com/substations/maryland/tap139169-b5523215 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP139169 substation, Maryland is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.