TAP138841

Substation

Kansas

Max voltage
115
kV

TAP138841 is an electric transmission substation in Kansas. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateKansas
Coordinates38.0282, -97.9740

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138841, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138841 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN168685Substation-AdjacentKSSedgwick County345 kV600 MW4.3 yrs62.2
UNKNOWN118040Substation-AdjacentKSReno County230 kV300 MW4.3 yrs61.4
RENOSubstation-AdjacentKSReno County345 kV600 MW4.3 yrs61.3
OZ RenoGreenfieldKSReno——4.3 yrs60.2
UNKNOWN118044Substation-AdjacentKSMcPherson County230 kV300 MW4.3 yrs59.5
EC Near Hutchinson Energy CenterGreenfieldKSReno——4.3 yrs59.1
EC Near Hutchinson Energy CenterGreenfieldKSReno——4.3 yrs58.7
EC Near Hutchinson Energy CenterGreenfieldKSReno——4.3 yrs57.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP138841 substation, Kansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.