Skip to content
Gridcensus

TAP138331

Substation

Indiana

Max voltage
69
kV

TAP138331 is an electric transmission substation in Indiana. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateIndiana
Coordinates39.0017, -87.0727

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138331, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138331 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SPENCERSubstation-AdjacentINOwen County230 kV300 MW3.0 yrs63.4
EDWARDSPORT STATION IGCCSubstation-AdjacentINDaviess County345 kV600 MW3.0 yrs63.4
WHEATLAND STATIONSubstation-AdjacentINKnox County345 kV600 MW3.0 yrs62.5
WORTHINGTON PRIMARY SUBSTATIONSubstation-AdjacentINGreene County345 kV600 MW3.0 yrs62.4
EC Coal Sullivan CountyGreenfieldINSullivan County——3.0 yrs59.1
EC Coal Clay CountyGreenfieldINClay County——3.0 yrs59.0
EDWARDSPORT STATION (138 KV)Substation-AdjacentINDaviess County138 kV100 MW3.0 yrs58.9
EC Coal Greene CountyGreenfieldINGreene County——3.0 yrs58.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP138331 substation, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.