TAP138326
SubstationIndiana · DUKE ENERGY INDIANA, LLC
At a glance
TAP138326 is an electric transmission substation in Indiana, on DUKE ENERGY INDIANA, LLC's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #108037 | 69 kV | DUKE ENERGY INDIANA, LLC | IN SERVICE | 3.4 mi |
| #111275 | 69 kV | DUKE ENERGY INDIANA, LLC | IN SERVICE | 0.0 mi |
| #176263 | 69 kV | DUKE ENERGY INDIANA, LLC | IN SERVICE | 10.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP138326, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN124618 | Substation-Adjacent | IN | Vigo County | 345 kV | 600 MW | 3.0 yrs | 67.3 |
| SULLIVAN | Substation-Adjacent | IN | Sullivan County | 765 kV | 1,000 MW | 3.0 yrs | 65.0 |
| UNKNOWN124759 | Substation-Adjacent | IN | Vigo County | 345 kV | 600 MW | 3.0 yrs | 63.2 |
| UNKNOWN124442 | Substation-Adjacent | IN | Vigo County | 230 kV | 300 MW | 3.0 yrs | 62.8 |
| BREED | Substation-Adjacent | IN | Sullivan County | 345 kV | 600 MW | 3.0 yrs | 62.5 |
| MEROM STATION | Substation-Adjacent | IN | Sullivan County | 345 kV | 600 MW | 3.0 yrs | 62.5 |
| WORTHINGTON PRIMARY SUBSTATION | Substation-Adjacent | IN | Greene County | 345 kV | 600 MW | 3.0 yrs | 62.4 |
| UNKNOWN124449 | Substation-Adjacent | IN | Vigo County | 230 kV | 300 MW | 3.0 yrs | 61.6 |
Who owns the transmission lines at TAP138326?
The 3 connected lines listed above are owned by DUKE ENERGY INDIANA, LLC. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 14 miles.
How do candidate sites near TAP138326 score?
The 8 highest-scoring candidate sites within about 25 miles range from 62 to 67 on the 0–100 DC Readiness scale. They fall in Vigo County, Sullivan County, Greene County. The Indiana average across 8,629 scored sites is 54. 1,024 of those Indiana sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP138326 substation?
TAP138326 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP138326 is below the national midpoint.
How many transmission lines connect to TAP138326 substation?
3 transmission lines terminate at or pass through TAP138326 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 14 miles.
Who owns TAP138326 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP138326 belong to DUKE ENERGY INDIANA, LLC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP138326 substation located?
TAP138326 is in Indiana at 39.2269, -87.3997. The datacenter candidate sites closest to it are in Vigo County, Sullivan County, Greene County.
Are there datacenter candidate sites near TAP138326 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP138326. The highest-scoring is UNKNOWN124618 at 67/100. Across Indiana, the average DC Readiness score is 54.
More in Indiana
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP138326 substation, Indiana”, https://gridcensus.com/substations/indiana/tap138326-bbb53964 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP138326 substation, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.