ILLINOIS ROAD

Substation

Indiana

Max voltage
345
kV

ILLINOIS ROAD is an electric transmission substation in Indiana. It is classified as high-voltage (345 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

StateIndiana
Coordinates41.0730, -85.2948

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ILLINOIS ROAD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ILLINOIS ROAD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SORENSONSubstation-AdjacentINHuntington County765 kV1,000 MW3.8 yrs69.0
ALLENSubstation-AdjacentINAllen County345 kV600 MW3.8 yrs66.7
ROBISON PARK (345 KV)Substation-AdjacentINAllen County345 kV600 MW3.8 yrs66.5
ILLINOIS ROADSubstation-AdjacentINWhitley County345 kV600 MW3.8 yrs66.1
E. WHITLEYSubstation-AdjacentINWhitley County345 kV600 MW3.8 yrs66.1
COLLINGWOODSubstation-AdjacentINDeKalb County345 kV600 MW3.8 yrs65.8
MERIDIANSubstation-AdjacentINWhitley County345 kV600 MW3.8 yrs65.3
SOUTH BUTLERSubstation-AdjacentINDeKalb County345 kV600 MW3.8 yrs64.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for ILLINOIS ROAD substation, Indiana is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.