TAP207649

Substation

Idaho

Max voltage
35
kV

TAP207649 is an electric transmission substation in Idaho. It is classified as distribution (<69 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage35 kV
Min voltage35 kV
Voltage classDistribution (<69 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateIdaho
Coordinates48.4531, -116.8416

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207649, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207649 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC FFE Bonner CountyGreenfieldIDBonner County——5.0 yrs58.9
OZ Pend OreilleGreenfieldWAPend Oreille——3.5 yrs57.4
EC FFE Boundary CountyGreenfieldIDBoundary County——5.0 yrs56.0
TAP204953Substation-AdjacentIDBonner County115 kV100 MW5.0 yrs55.9
TAP207704Substation-AdjacentWAPend Oreille County115 kV100 MW3.5 yrs55.9
OZ BoundaryGreenfieldIDBoundary——5.0 yrs55.6
UNKNOWN204957Substation-AdjacentIDBonner County115 kV100 MW5.0 yrs55.4
TAP203498Substation-AdjacentIDBonner County115 kV100 MW5.0 yrs55.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP207649 substation, Idaho is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.