At a glance

TAP207227 is a 115 kV electric substation in Idaho on IDAHO POWER CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is TAP207233 in Lemhi County, with a DC Readiness score of 49/100.

TAP207227 is an electric transmission substation in Idaho, on IDAHO POWER CO's transmission network. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage69 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership

Line owner (most lines)IDAHO POWER CO
StateIdaho
Coordinates45.0125, -113.6504

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#208303115 kVIDAHO POWER CO—0.0 mi
#208304115 kVIDAHO POWER CO—0.0 mi
#20830769 kVIDAHO POWER CO—0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207227, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207227 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP207233Substation-AdjacentIDLemhi County115 kV100 MW5.0 yrs49.4
UNKNOWN201303Substation-AdjacentIDLemhi County115 kV100 MW5.0 yrs49.4
UNKNOWN207231Substation-AdjacentIDLemhi County115 kV100 MW5.0 yrs49.4
TENDOY 2Substation-AdjacentIDLemhi County115 kV100 MW5.0 yrs49.4
UNKNOWN207234Substation-AdjacentIDLemhi County115 kV100 MW5.0 yrs49.4
UNKNOWN207232Substation-AdjacentIDLemhi County115 kV100 MW5.0 yrs49.4
SALMON NATIONAL FORESTFederal ExcessIDLemhi County——5.0 yrs45.3
Mine SiteFormer MineIDLemhi County——5.0 yrs45.1

Who owns the transmission lines at TAP207227?

The 3 connected lines listed above are owned by IDAHO POWER CO. Line voltages range from 69 kV to 115 kV. Their combined recorded length is about 0.1 miles.

How do candidate sites near TAP207227 score?

The 8 highest-scoring candidate sites within about 25 miles range from 45 to 49 on the 0–100 DC Readiness scale. They fall in Lemhi County. The Idaho average across 2,171 scored sites is 51.7. 646 of those Idaho sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP207227 substation?

TAP207227 has a maximum voltage of 115 kV and a minimum of 69 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP207227 is at the national midpoint.

How many transmission lines connect to TAP207227 substation?

3 transmission lines terminate at or pass through TAP207227 in the HIFLD line data. The connected lines listed here run at 115 kV, 69 kV. Together the listed lines cover about 0.1 miles.

Who owns TAP207227 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP207227 belong to IDAHO POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP207227 substation located?

TAP207227 is in Idaho at 45.0125, -113.6504. The datacenter candidate sites closest to it are in Lemhi County.

Are there datacenter candidate sites near TAP207227 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP207227. The highest-scoring is TAP207233 at 49/100. Across Idaho, the average DC Readiness score is 51.7.

More in Idaho

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP207227 substation, Idaho”, https://gridcensus.com/substations/idaho/tap207227-8df1cf09 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP207227 substation, Idaho is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.