POCATELLO

Substation

Idaho

Max voltage
69
kV

POCATELLO is an electric transmission substation in Idaho. It is classified as distribution (69–115 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage46 kV
Voltage classDistribution (69–115 kV)
Connected lines5

Ownership & operation

Operator not catalogued for this substation.

StateIdaho
Coordinates42.8627, -112.4589

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of POCATELLO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near POCATELLO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
KINPORTSubstation-AdjacentIDPower County345 kV600 MW5.0 yrs62.0
SUNBEAMSubstation-AdjacentIDPower County230 kV300 MW5.0 yrs59.6
UNKNOWN207277Substation-AdjacentIDBannock County115 kV100 MW5.0 yrs57.2
UNKNOWN205004Substation-AdjacentIDBannock County115 kV100 MW5.0 yrs57.2
FREMONTSubstation-AdjacentIDBannock County161 kV100 MW5.0 yrs57.1
TAP207212Substation-AdjacentIDBingham County138 kV100 MW5.0 yrs57.0
TAP204750Substation-AdjacentIDBingham County138 kV100 MW5.0 yrs57.0
BLACKFOOTSubstation-AdjacentIDBingham County138 kV100 MW5.0 yrs56.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for POCATELLO substation, Idaho is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.