At a glance

MILFORD POWER is a 115 kV electric substation in Connecticut, recorded in the HIFLD transmission dataset. 6 transmission lines connect to it. 20 of Connecticut's 154 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is BRIDGEPORT RESCO in Greater Bridgeport Planning Region, with a DC Readiness score of 72/100.

MILFORD POWER is an electric transmission substation in Connecticut. It is classified as sub-transmission (115 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines6

Ownership

No owner is recorded for the lines that connect here.

Coordinates41.2069, -73.1056

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#119254115 kV—IN SERVICE0.2 mi
#125478115 kV—IN SERVICE1.4 mi
#135427115 kV—IN SERVICE1.4 mi
#138101115 kV—IN SERVICE2.6 mi
#143175115 kV—IN SERVICE0.2 mi
#167214115 kV—IN SERVICE2.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MILFORD POWER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MILFORD POWER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BRIDGEPORT RESCOSubstation-AdjacentCTGreater Bridgeport Planning Region345 kV600 MW4.3 yrs71.7
NEW HAVEN HARBORSubstation-AdjacentCTSouth Central Connecticut Planning Region345 kV600 MW4.3 yrs68.8
NO. WALLSubstation-AdjacentCTLower Connecticut River Valley Planning Region345 kV600 MW4.3 yrs68.2
PLUMTREESubstation-AdjacentCTWestern Connecticut Planning Region345 kV600 MW4.3 yrs68.2
SOUTHINGTONSubstation-AdjacentCTNaugatuck Valley Planning Region345 kV600 MW4.3 yrs67.8
DEVONSubstation-AdjacentCTGreater Bridgeport Planning Region115 kV100 MW4.3 yrs65.0
SHEPAUGSubstation-AdjacentCTNaugatuck Valley Planning Region115 kV100 MW4.3 yrs63.9
FREIGHTSubstation-AdjacentCTNaugatuck Valley Planning Region115 kV100 MW4.3 yrs63.5

How does MILFORD POWER compare with other substations in Connecticut?

Connecticut has 300 substation records in HIFLD, of which 154 carry a station name; the rest are unnamed tap points, risers and line ends. 121 named substations in the state are in MILFORD POWER's 115–229 kV band (79% of named stations). 20 sit in a higher band. 20 named substations in Connecticut operate at 345 kV or above. The highest voltage recorded in the state is 345 kV, and the state median is 115 kV.

How do candidate sites near MILFORD POWER score?

The 8 highest-scoring candidate sites within about 25 miles range from 64 to 72 on the 0–100 DC Readiness scale. They fall in Greater Bridgeport Planning Region, South Central Connecticut Planning Region, Lower Connecticut River Valley Planning Region, Western Connecticut Planning Region. The Connecticut average across 919 scored sites is 56.7. 171 of those Connecticut sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is MILFORD POWER substation?

MILFORD POWER has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so MILFORD POWER is at the national midpoint.

How many transmission lines connect to MILFORD POWER substation?

6 transmission lines terminate at or pass through MILFORD POWER in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 8.3 miles.

Where is MILFORD POWER substation located?

MILFORD POWER is in Connecticut at 41.2069, -73.1056. The datacenter candidate sites closest to it are in Greater Bridgeport Planning Region, South Central Connecticut Planning Region, Lower Connecticut River Valley Planning Region.

Are there datacenter candidate sites near MILFORD POWER substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of MILFORD POWER. The highest-scoring is BRIDGEPORT RESCO at 72/100. Across Connecticut, the average DC Readiness score is 56.7.

Other 115 kV substations in Connecticut

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “MILFORD POWER substation, Connecticut”, https://gridcensus.com/substations/connecticut/milford-power-c7d6a9e0 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for MILFORD POWER substation, Connecticut is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.