Skip to content
Gridcensus

FROST BRIDGE

Substation

Connecticut

Max voltage
345
kV

FROST BRIDGE is an electric transmission substation in Connecticut. It is classified as high-voltage (345 kv) and connects 10 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage115 kV
Voltage classHigh-voltage (345 kV)
Connected lines10

Ownership & operation

Operator not catalogued for this substation.

Coordinates41.6125, -73.0607

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FROST BRIDGE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FROST BRIDGE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NEW HAVEN HARBORSubstation-AdjacentCTSouth Central Connecticut Planning Region345 kV600 MW3.9 yrs68.9
FROST BRIDGESubstation-AdjacentCTNaugatuck Valley Planning Region345 kV600 MW3.9 yrs68.4
PLUMTREESubstation-AdjacentCTWestern Connecticut Planning Region345 kV600 MW3.9 yrs67.7
SOUTHINGTONSubstation-AdjacentCTNaugatuck Valley Planning Region345 kV600 MW3.9 yrs67.3
NORTH BLOOMFIELDSubstation-AdjacentCTCapitol Planning Region345 kV600 MW3.9 yrs67.2
NO. WALLSubstation-AdjacentCTLower Connecticut River Valley Planning Region345 kV600 MW3.9 yrs66.8
LONG MOUNTAINSubstation-AdjacentCTDutchess County345 kV600 MW3.9 yrs65.0
SHEPAUGSubstation-AdjacentCTNaugatuck Valley Planning Region115 kV100 MW3.9 yrs64.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FROST BRIDGE substation, Connecticut. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.