At a glance

TAP142056 is a 115 kV electric substation in Arkansas on ENTERGY ARKANSAS INC's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is STERLINGTON in Ouachita Parish, with a DC Readiness score of 62/100.

TAP142056 is an electric transmission substation in Arkansas, on ENTERGY ARKANSAS INC's transmission network. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership

Line owner (most lines)ENTERGY ARKANSAS INC
Coordinates33.0967, -92.4430

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#101824115 kVENTERGY ARKANSAS INCIN SERVICE8.5 mi
#112902115 kVENTERGY ARKANSAS INCIN SERVICE3.2 mi
#149640115 kVENTERGY ARKANSAS INCIN SERVICE10.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142056, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142056 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
STERLINGTONSubstation-AdjacentLAOuachita Parish500 kV1,000 MW4.3 yrs62.3
UNKNOWN117211Substation-AdjacentARUnion County500 kV1,000 MW4.3 yrs61.8
EC FFE Bradley CountyGreenfieldARBradley County——4.3 yrs57.4
UNKNOWN112561Substation-AdjacentLAOuachita Parish115 kV100 MW4.3 yrs56.9
OZ UnionGreenfieldARUnion——4.3 yrs56.7
EC FFE Union CountyGreenfieldARUnion County——4.3 yrs56.3
EC Near SterlingtonGreenfieldLAOuachita——4.3 yrs55.2
UNKNOWN121607Substation-AdjacentARUnion County115 kV100 MW4.3 yrs54.1

Who owns the transmission lines at TAP142056?

The 3 connected lines listed above are owned by ENTERGY ARKANSAS INC. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 22.1 miles.

How do candidate sites near TAP142056 score?

The 8 highest-scoring candidate sites within about 25 miles range from 54 to 62 on the 0–100 DC Readiness scale. They fall in Ouachita Parish, Union County, Bradley County, Union. The Arkansas average across 1,651 scored sites is 53.6. 758 of those Arkansas sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP142056 substation?

TAP142056 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP142056 is at the national midpoint.

How many transmission lines connect to TAP142056 substation?

3 transmission lines terminate at or pass through TAP142056 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 22.1 miles.

Who owns TAP142056 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP142056 belong to ENTERGY ARKANSAS INC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP142056 substation located?

TAP142056 is in Arkansas at 33.0967, -92.4430. The datacenter candidate sites closest to it are in Ouachita Parish, Union County, Bradley County.

Are there datacenter candidate sites near TAP142056 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP142056. The highest-scoring is STERLINGTON at 62/100. Across Arkansas, the average DC Readiness score is 53.6.

More in Arkansas

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP142056 substation, Arkansas”, https://gridcensus.com/substations/arkansas/tap142056-4bfee25f (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP142056 substation, Arkansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.