Skip to content
Gridcensus

EL DORADO SUBSTATION

Substation

Arkansas

Max voltage
500
kV

EL DORADO SUBSTATION is an electric transmission substation in Arkansas. It is classified as extra-high-voltage (500 kv) and connects 11 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage115 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines11

Ownership & operation

Operator not catalogued for this substation.

Coordinates33.2887, -92.5918

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of EL DORADO SUBSTATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near EL DORADO SUBSTATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN117211Substation-AdjacentARUnion County500 kV1,000 MW2.8 yrs58.6
EC FFE Ouachita CountyGreenfieldAROuachita County——1.4 yrs55.6
OZ UnionGreenfieldARUnion——1.4 yrs54.7
EC FFE Union CountyGreenfieldARUnion County——1.4 yrs54.6
EC FFE Calhoun CountyGreenfieldARCalhoun County——1.4 yrs53.9
OZ OuachitaGreenfieldAROuachita——1.4 yrs52.8
UNKNOWN107723Substation-AdjacentAROuachita County115 kV100 MW2.8 yrs51.5
UNKNOWN107724Substation-AdjacentAROuachita County115 kV100 MW2.8 yrs51.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for EL DORADO SUBSTATION substation, Arkansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.