Skip to content
Gridcensus

TAP154388

Substation

Alabama · TENNESSEE VALLEY AUTHORITY

Max voltage
—
kV

At a glance

TAP154388 is an electric substation in Alabama on TENNESSEE VALLEY AUTHORITY's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is LIMESTONE in Limestone County, with a DC Readiness score of 70/100.

TAP154388 is an electric transmission substation in Alabama, on TENNESSEE VALLEY AUTHORITY's transmission network. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership

Line owner (most lines)TENNESSEE VALLEY AUTHORITY
StateAlabama
Coordinates34.8262, -86.9827

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#101773—TENNESSEE VALLEY AUTHORITYIN SERVICE5.6 mi
#134122—TENNESSEE VALLEY AUTHORITYIN SERVICE0.0 mi
#145765—TENNESSEE VALLEY AUTHORITYIN SERVICE2.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154388, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154388 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LIMESTONESubstation-AdjacentALLimestone County500 kV1,000 MW3.9 yrs69.5
USARMY/NASA Redstone ArsenalBrownfieldALMadison—10 MW3.9 yrs69.2
TRINITYSubstation-AdjacentALLimestone County500 kV1,000 MW3.9 yrs68.0
UNKNOWN114484Substation-AdjacentALLimestone County500 kV1,000 MW3.9 yrs67.9
BROWNS FERRYSubstation-AdjacentALLimestone County500 kV1,000 MW3.9 yrs67.4
OZ MadisonGreenfieldALMadison——3.9 yrs66.3
OZ MadisonGreenfieldALMadison——3.9 yrs65.7
OZ MadisonGreenfieldALMadison——3.9 yrs65.6

Who owns the transmission lines at TAP154388?

The 3 connected lines listed above are owned by TENNESSEE VALLEY AUTHORITY. Their combined recorded length is about 7.8 miles.

How do candidate sites near TAP154388 score?

The 8 highest-scoring candidate sites within about 25 miles range from 66 to 70 on the 0–100 DC Readiness scale. They fall in Limestone County, Madison. The Alabama average across 3,107 scored sites is 55. 1,164 of those Alabama sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP154388 substation?

3 transmission lines terminate at or pass through TAP154388 in the HIFLD line data. Together the listed lines cover about 7.8 miles.

Who owns TAP154388 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP154388 belong to TENNESSEE VALLEY AUTHORITY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP154388 substation located?

TAP154388 is in Alabama at 34.8262, -86.9827. The datacenter candidate sites closest to it are in Limestone County, Madison.

Are there datacenter candidate sites near TAP154388 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP154388. The highest-scoring is LIMESTONE at 70/100. Across Alabama, the average DC Readiness score is 55.

More in Alabama

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP154388 substation, Alabama”, https://gridcensus.com/substations/alabama/tap154388-552c958b (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP154388 substation, Alabama is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.