TAP142902

Substation

Alabama · ALABAMA POWER CO

Max voltage
—
kV

At a glance

TAP142902 is an electric substation in Alabama on ALABAMA POWER CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN109008 in Dale County, with a DC Readiness score of 60/100.

TAP142902 is an electric transmission substation in Alabama, on ALABAMA POWER CO's transmission network. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership

Line owner (most lines)ALABAMA POWER CO
StateAlabama
Coordinates31.7070, -85.1476

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#106672—ALABAMA POWER COIN SERVICE7.3 mi
#127316—ALABAMA POWER COIN SERVICE9.6 mi
#131303—ALABAMA POWER COIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142902, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142902 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN109008Substation-AdjacentALDale County115 kV100 MW3.9 yrs59.9
EC Near Crestwood DothanGreenfieldALHouston——3.9 yrs59.3
UNKNOWN109729Substation-AdjacentALHenry County115 kV100 MW3.9 yrs59.1
TAP142981Substation-AdjacentALHenry County115 kV100 MW3.9 yrs59.0
UNKNOWN109007Substation-AdjacentALHenry County115 kV100 MW3.9 yrs59.0
UNKNOWN109734Substation-AdjacentALDale County115 kV100 MW3.9 yrs58.9
EC Near Crestwood DothanGreenfieldALHouston——3.9 yrs58.8
UNKNOWN109004Substation-AdjacentALHenry County115 kV100 MW3.9 yrs58.8

Who owns the transmission lines at TAP142902?

The 3 connected lines listed above are owned by ALABAMA POWER CO. Their combined recorded length is about 16.9 miles.

How do candidate sites near TAP142902 score?

The 8 highest-scoring candidate sites within about 25 miles range from 59 to 60 on the 0–100 DC Readiness scale. They fall in Dale County, Houston, Henry County. The Alabama average across 3,107 scored sites is 55. 1,164 of those Alabama sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP142902 substation?

3 transmission lines terminate at or pass through TAP142902 in the HIFLD line data. Together the listed lines cover about 16.9 miles.

Who owns TAP142902 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP142902 belong to ALABAMA POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP142902 substation located?

TAP142902 is in Alabama at 31.7070, -85.1476. The datacenter candidate sites closest to it are in Dale County, Houston, Henry County.

Are there datacenter candidate sites near TAP142902 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP142902. The highest-scoring is UNKNOWN109008 at 60/100. Across Alabama, the average DC Readiness score is 55.

More in Alabama

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP142902 substation, Alabama”, https://gridcensus.com/substations/alabama/tap142902-51ae4a49 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP142902 substation, Alabama is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.