MONTGOMERY SWITCHING STATION

Substation

Alabama · ALABAMA POWER CO

Max voltage
230
kV

At a glance

MONTGOMERY SWITCHING STATION is a 230 kV electric substation in Alabama on ALABAMA POWER CO's transmission network, recorded in the HIFLD transmission dataset. 5 transmission lines connect to it. 15 of Alabama's 158 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is AUTAUGAVILLE in Autauga County, with a DC Readiness score of 72/100.

MONTGOMERY SWITCHING STATION is an electric transmission substation in Alabama, on ALABAMA POWER CO's transmission network. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership

Line owner (most lines)ALABAMA POWER CO
StateAlabama
Coordinates32.3568, -86.3729

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#102902230 kVALABAMA POWER COIN SERVICE2.0 mi
#107546230 kVALABAMA POWER COIN SERVICE12.5 mi
#125140230 kVALABAMA POWER COIN SERVICE7.7 mi
#128481230 kVALABAMA POWER COIN SERVICE15.9 mi
#133061230 kVALABAMA POWER COIN SERVICE6.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MONTGOMERY SWITCHING STATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MONTGOMERY SWITCHING STATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
AUTAUGAVILLESubstation-AdjacentALAutauga County500 kV1,000 MW3.9 yrs71.9
SNOWDOUNSubstation-AdjacentALMontgomery County500 kV1,000 MW3.9 yrs69.6
WEST MONTGOMERYSubstation-AdjacentALMontgomery County230 kV300 MW3.9 yrs67.2
UNKNOWN133801Substation-AdjacentALAutauga County500 kV1,000 MW3.9 yrs66.5
MONTGOMERY SWITCHING STATIONSubstation-AdjacentALMontgomery County230 kV300 MW3.9 yrs66.2
SOUTH MONTGOMERYSubstation-AdjacentALMontgomery County230 kV300 MW3.9 yrs66.2
TAP146014Substation-AdjacentALMontgomery County230 kV300 MW3.9 yrs66.1
MADISON PARKSubstation-AdjacentALElmore County230 kV300 MW3.9 yrs66.0

How does MONTGOMERY SWITCHING STATION compare with other substations in Alabama?

Alabama has 2,790 substation records in HIFLD, of which 158 carry a station name; the rest are unnamed tap points, risers and line ends. 33 named substations in the state are in MONTGOMERY SWITCHING STATION's 230–344 kV band (21% of named stations). 15 sit in a higher band. 15 named substations in Alabama operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 161 kV.

Who owns the transmission lines at MONTGOMERY SWITCHING STATION?

The 5 connected lines listed above are owned by ALABAMA POWER CO. Line voltages range from 230 kV to 230 kV. Their combined recorded length is about 44.8 miles.

How do candidate sites near MONTGOMERY SWITCHING STATION score?

The 8 highest-scoring candidate sites within about 25 miles range from 66 to 72 on the 0–100 DC Readiness scale. They fall in Autauga County, Montgomery County, Elmore County. The Alabama average across 3,107 scored sites is 55. 1,164 of those Alabama sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is MONTGOMERY SWITCHING STATION substation?

MONTGOMERY SWITCHING STATION has a maximum voltage of 230 kV. That places it in the 230–344 kV band. The median named US substation in this dataset is 115 kV, so MONTGOMERY SWITCHING STATION is above the national midpoint.

How many transmission lines connect to MONTGOMERY SWITCHING STATION substation?

5 transmission lines terminate at or pass through MONTGOMERY SWITCHING STATION in the HIFLD line data. The connected lines listed here run at 230 kV. Together the listed lines cover about 44.8 miles.

Who owns MONTGOMERY SWITCHING STATION substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at MONTGOMERY SWITCHING STATION belong to ALABAMA POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is MONTGOMERY SWITCHING STATION substation located?

MONTGOMERY SWITCHING STATION is in Alabama at 32.3568, -86.3729. The datacenter candidate sites closest to it are in Autauga County, Montgomery County, Elmore County.

Are there datacenter candidate sites near MONTGOMERY SWITCHING STATION substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of MONTGOMERY SWITCHING STATION. The highest-scoring is AUTAUGAVILLE at 72/100. Across Alabama, the average DC Readiness score is 55.

Other 230 kV substations in Alabama

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “MONTGOMERY SWITCHING STATION substation, Alabama”, https://gridcensus.com/substations/alabama/montgomery-switching-station-53f35465 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for MONTGOMERY SWITCHING STATION substation, Alabama is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.