Wave Broadband Tahoma Terra Facility
DatacenteractiveWA
Wave Broadband Tahoma Terra Facility is an operating datacenter facility in WA. It spans approximately 9,139 square feet. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Facility
Nearby internet exchanges
- WowRackTukwila, WA · 21 networks
- Sabey Intergate East Building 4Tukwila, WA · 13 networks
- Digital Fortress (TUK)Tukwila, WA · 11 networks
- EdgeConneX Seattle (EDCSEA01)Tukwila, WA · 8 networks
- Equinix SE4 - Seattle, KentKent, WA · 8 networks
Other datacenters nearby
- CenterisWA
- Centeris SH1 ColocationWA
- Centeris SH2 Build-to-SuitWA
- Cogent SeattleCogent Communications, Inc. · Federal Way, WA
- Equinix SE4 - Seattle, KentEquinix, Inc. · Kent, WA
Nearby datacenter candidate sites
Scored candidate sites near Wave Broadband Tahoma Terra Facility, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TRANSALTA CENTRALIA GENERATION | Substation-Adjacent | WA | Thurston County | 500 kV | 1,000 MW | 1.7 yrs | 76.1 |
| TACOMA | Substation-Adjacent | WA | Pierce County | 500 kV | 1,000 MW | 1.7 yrs | 75.6 |
| PAUL | Substation-Adjacent | WA | Thurston County | 500 kV | 1,000 MW | 1.7 yrs | 73.6 |
| SOUTHWEST | Substation-Adjacent | WA | Pierce County | 230 kV | 300 MW | 1.7 yrs | 72.4 |
| TAP206441 | Substation-Adjacent | WA | Pierce County | 230 kV | 300 MW | 1.7 yrs | 72.3 |
| OLYMPIA | Substation-Adjacent | WA | Thurston County | 500 kV | 1,000 MW | 1.7 yrs | 71.9 |
| UNKNOWN205981 | Substation-Adjacent | WA | Kitsap County | 230 kV | 300 MW | 1.7 yrs | 71.9 |
| COWLITZ | Substation-Adjacent | WA | Pierce County | 230 kV | 300 MW | 1.7 yrs | 71.6 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.