T-Mobile Everglades MSO Data Center
DatacenteractiveSunrise, FL
T-Mobile Everglades MSO Data Center is an operating datacenter facility in Sunrise, FL. It spans approximately 49,233 square feet. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Facility
Nearby internet exchanges
- Equinix MI1 - Miami, NOTAMiami, FL · 323 networks
- ColoHouse MiamiMiami, FL · 43 networks
- Digital Realty MIA (36 NE 2nd St)Miami, FL · 32 networks
- Equinix MI2 - MiamiMiami, FL · 28 networks
- CoreSite - Miami (MI1)Miami, FL · 22 networks
Other datacenters nearby
- NAP of the AmericasFL
- Flexential Fort LauderdaleFlexential · Fort Lauderdale, FL
- Datacenter 00435531451Miami, FL
- CyrusOne MiamiCyrusOne · Miami, FL
- 500 Green (AKA VOLICO 2.0)Biznesshosting, Inc. DBA VOLICO · Deerfield, FL
Nearby datacenter candidate sites
Scored candidate sites near T-Mobile Everglades MSO Data Center, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| OAKLAND PARK | Substation-Adjacent | FL | Broward County | 230 kV | 300 MW | 3.6 yrs | 76.8 |
| UNKNOWN120153 | Substation-Adjacent | FL | Miami-Dade County | 230 kV | 300 MW | 3.6 yrs | 76.7 |
| YAMATO | Substation-Adjacent | FL | Palm Beach County | 230 kV | 300 MW | 3.6 yrs | 76.7 |
| DEERFIELD BEACH | Substation-Adjacent | FL | Broward County | 230 kV | 300 MW | 3.6 yrs | 76.3 |
| DADE | Substation-Adjacent | FL | Miami-Dade County | 230 kV | 300 MW | 3.6 yrs | 75.9 |
| WOODLANDS | Substation-Adjacent | FL | Broward County | 230 kV | 300 MW | 3.6 yrs | 75.9 |
| UNKNOWN108642 | Substation-Adjacent | FL | Broward County | 230 kV | 300 MW | 3.6 yrs | 75.8 |
| DELMAR | Substation-Adjacent | FL | Broward County | 230 kV | 300 MW | 3.6 yrs | 75.8 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for T-Mobile Everglades MSO Data Center, Sunrise, FL. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.