Serverfarm TiTAN Moses Lake
DatacenteractiveMoses Lake, WA · Serverfarm
Serverfarm TiTAN Moses Lake is an operating datacenter facility in Moses Lake, WA, operated by Serverfarm.. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Location
Nearby internet exchanges
- Intergate.QuincyQuincy, WA · 4 networks
- Serverfarm TiTAN Moses LakeMoses Lake, WA · 2 networks
- H5 Data Centers QuincyQuincy, WA · 2 networks
- H5 Data Centers Quincy 2/3Quincy, WA · 0 networks
Other datacenters nearby
- Intergate Quincy Data CenterSabey Data Centers · WA
- H5 Data CenterIntuit · WA
- Datacenter 01193914601WA
- Vantage WA13WA
- Datacenter 00283051475WA
Nearby datacenter candidate sites
Scored candidate sites near Serverfarm TiTAN Moses Lake, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| LARSON | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 6.9 yrs | 66.7 |
| EC Near Randolph Road | Greenfield | WA | Grant | — | — | 1.7 yrs | 65.5 |
| UNKNOWN206113 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 6.9 yrs | 65.4 |
| Randolph Road | Brownfield | WA | Grant County | — | 32 MW | 1.7 yrs | 65.4 |
| EC Near Randolph Road | Greenfield | WA | Grant | — | — | 1.7 yrs | 65.1 |
| TAP206112 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 6.9 yrs | 65.0 |
| TAP206107 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 6.9 yrs | 64.9 |
| UNKNOWN206111 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 6.9 yrs | 64.8 |
See something wrong or out of date?
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.