Meta Bowling Green Data Center
DatacenteractiveOH
Meta Bowling Green Data Center is an operating datacenter facility in OH. It spans approximately 21,498,189 square feet. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Facility
Nearby internet exchanges
- Amplex DC0Luckey, OH · 1 networks
Other datacenters nearby
- Datacenter 11815482844MI
- Amplex DC0Amplex Electric, Inc. · Luckey, OH
- Datacenter 11815482844MI
Nearby datacenter candidate sites
Scored candidate sites near Meta Bowling Green Data Center, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| LEMOYNE | Substation-Adjacent | OH | Wood County | 345 kV | 600 MW | 2.2 yrs | 78.8 |
| LEMOYNE | Substation-Adjacent | OH | Wood County | 345 kV | 600 MW | 3.2 yrs | 77.0 |
| FirstEnergy Bay Shore | Brownfield | OH | Lucas | — | 499 MW | — | 76.5 |
| UNKNOWN171366 | Substation-Adjacent | OH | Lucas County | 345 kV | 600 MW | 2.2 yrs | 76.4 |
| UNKNOWN133807 | Substation-Adjacent | OH | Fulton County | 345 kV | 600 MW | 3.2 yrs | 74.3 |
| UNKNOWN113613 | Substation-Adjacent | OH | Lucas County | 345 kV | 600 MW | 3.2 yrs | 74.3 |
| UNKNOWN113830 | Substation-Adjacent | OH | Lucas County | 345 kV | 600 MW | 3.2 yrs | 74.2 |
| FOSTORIA CENTRAL SUBSTATION | Substation-Adjacent | OH | Hancock County | 345 kV | 600 MW | 3.2 yrs | 74.0 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Meta Bowling Green Data Center, OH. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.