Lumen Jacksonville
DatacenteractiveJacksonville, FL · Lumen Technologies Inc
Lumen Jacksonville is an operating datacenter facility in Jacksonville, FL, operated by Lumen Technologies Inc.. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Location
Nearby internet exchanges
- Cologix JAX1Jacksonville, FL · 33 networks
- SBA Edge - Jacksonville (JAX)Jacksonville, FL · 15 networks
- JAX NAPJacksonville, FL · 7 networks
- Cologix JAX2Jacksonville, FL · 6 networks
- TierPoint JacksonvilleJacksonville, FL · 6 networks
Other datacenters nearby
- Cologix Jacksonville JAX1SBA Edge - Jacksonville (JAX) · Jacksonville, FL
- EdgeConneX Jacksonville (EDCJAX01)EdgeConneX Inc. · Jacksonville, FL
- Flexential JacksonvilleFlexential · Jacksonville, FL
- TierPoint JacksonvilleTierPoint, LLC · Jacksonville, FL
- Flexential JacksonvilleFlexential · Jacksonville, FL
Nearby datacenter candidate sites
Scored candidate sites near Lumen Jacksonville, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| BARTRAM | Substation-Adjacent | FL | Duval County | 230 kV | 300 MW | 3.6 yrs | 75.6 |
| SWITZERLAND | Substation-Adjacent | FL | Clay County | 230 kV | 300 MW | 3.6 yrs | 75.2 |
| UNKNOWN120521 | Substation-Adjacent | FL | Duval County | 230 kV | 300 MW | 3.6 yrs | 75.0 |
| UNKNOWN120519 | Substation-Adjacent | FL | Duval County | 230 kV | 300 MW | 3.6 yrs | 74.1 |
| UNKNOWN120554 | Substation-Adjacent | FL | Duval County | 230 kV | 300 MW | 5.8 yrs | 74.1 |
| FORT CAROLINE | Substation-Adjacent | FL | Duval County | 230 kV | 300 MW | 5.8 yrs | 73.5 |
| SPRINGBANK | Substation-Adjacent | FL | Clay County | 230 kV | 300 MW | 3.6 yrs | 73.4 |
| TAP161532 | Substation-Adjacent | FL | Duval County | 230 kV | 300 MW | 3.6 yrs | 73.2 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Lumen Jacksonville, Jacksonville, FL. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.