Information Technology Data Center
DatacenteractiveNH · Phillips Exeter Academy
Information Technology Data Center is an operating datacenter facility in NH, operated by Phillips Exeter Academy. It spans approximately 7,733 square feet. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Facility
Nearby internet exchanges
- Centersquare Boston (BOS1-A)Waltham, MA · 5 networks
- EdgeConneX Boston (EDCBOS01)Billerica, MA · 5 networks
- Equinix BO1 - Boston, WalthamWaltham, MA · 3 networks
- ColoSpace - Bedford, NHBedford, NH · 2 networks
- Prov.net CHF1 (Boston North)Chelmsford, MA · 2 networks
Other datacenters nearby
- Markley Data CenterMarkley Group · Lowell, MA
- TierPoint DCTierPoint · Andover, MA
- University of New Hampshire DCUniversity of New Hampshire · NH
- FirstLight DCFirstLight · Portsmouth, NH
- Digital Realty BOS (55 Middlesex)Digital Realty · Bedford, MA
Nearby datacenter candidate sites
Scored candidate sites near Information Technology Data Center, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| SCOBIE POND 345KV | Substation-Adjacent | NH | Rockingham County | 345 kV | 600 MW | 3.5 yrs | 73.5 |
| ESSENTIAL POWER NEWINGTON LLC | Substation-Adjacent | NH | Rockingham County | 345 kV | 600 MW | 3.5 yrs | 73.1 |
| ELIOT | Substation-Adjacent | NH | Strafford County | 345 kV | 600 MW | 3.5 yrs | 72.0 |
| DEERFIELD | Substation-Adjacent | NH | Strafford County | 345 kV | 600 MW | 3.5 yrs | 71.6 |
| TEWKSBURY NO. 22A | Substation-Adjacent | MA | Middlesex County | 345 kV | 600 MW | 3.5 yrs | 71.3 |
| UNKNOWN132750 | Substation-Adjacent | NH | Rockingham County | 345 kV | 600 MW | 3.5 yrs | 71.2 |
| TEWKSBURY SUBSTATION | Substation-Adjacent | MA | Middlesex County | 230 kV | 300 MW | 3.5 yrs | 70.5 |
| MAGUIRE ROAD | Substation-Adjacent | ME | York County | 345 kV | 600 MW | 3.5 yrs | 70.2 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Information Technology Data Center, NH. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.