At a glance
HCA Information Technology & Services Data Center is a datacenter at TN. Among the best-connected interconnection facilities in the area, the closest is Level(3) Nashville (Sidco Drive), 8.2 miles away, with 4 connected networks.
Facility
Where is HCA Information Technology & Services Data Center located?
The facility's recorded address is TN. Tennessee has 47 catalogued datacenters, the 15th-most of any state.
What network and power infrastructure is near HCA Information Technology & Services Data Center?
5 PeeringDB interconnection facilities are listed in the surrounding area; of those, the closest is Level(3) Nashville (Sidco Drive), about 8.2 miles away. The best-connected of them, H5 Data Centers Nashville, has 22 networks present, against a Tennessee median of 3 networks per facility. 5 other datacenters are listed in the surrounding area (within about half a degree of latitude and longitude). The highest-scoring candidate site nearby is PIN HOOK in Davidson County, with a DC Readiness score of 72.8 out of 100 and a 500 kV substation nearby.
Nearby internet exchanges
- H5 Data Centers NashvilleNashville, TN · 22 networks
- EdgeConneX Nashville (EDCNAS01)Nashville, TN · 5 networks
- TierPoint NashvilleFranklin, TN · 4 networks
- Level(3) Nashville (Sidco Drive)Nashville, TN · 4 networks
- H5 Data Centers Nashville (TN01)Nashville, TN · 3 networks
Other datacenters nearby
- Gallatin Data CenterMeta · TN
- Datacenter 00826001605TN
- Meta Gallatin Data CenterMeta · TN
- Meta Gallatin Data CenterMeta · TN
- Meta Gallatin Data CenterMeta · TN
Nearby datacenter candidate sites
Scored candidate sites near HCA Information Technology & Services Data Center, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| PIN HOOK | Substation-Adjacent | TN | Davidson County | 500 kV | 1,000 MW | 3.9 yrs | 72.8 |
| WILSON | Substation-Adjacent | TN | Wilson County | 500 kV | 1,000 MW | 3.9 yrs | 71.4 |
| DAVIDSON | Substation-Adjacent | TN | Williamson County | 500 kV | 1,000 MW | 3.9 yrs | 71.3 |
| RUTHERFORD | Substation-Adjacent | TN | Rutherford County | 500 kV | 1,000 MW | 3.9 yrs | 71.0 |
| MAURY | Substation-Adjacent | TN | Maury County | 500 kV | 1,000 MW | 3.9 yrs | 69.3 |
| Music City Solar | Brownfield | TN | Davidson | — | 2 MW | 3.9 yrs | 69.3 |
| OZ Davidson | Greenfield | TN | Davidson | — | — | 3.9 yrs | 67.2 |
| OZ Davidson | Greenfield | TN | Davidson | — | — | 3.9 yrs | 66.9 |
See something wrong or out of date?
Frequently asked questions
What is the address of HCA Information Technology & Services Data Center?
HCA Information Technology & Services Data Center is located at TN. Its coordinates are 36.0326, -86.6377.
Which internet exchanges and carrier hotels are near HCA Information Technology & Services Data Center?
GridCensus lists 5 PeeringDB interconnection facilities near HCA Information Technology & Services Data Center: Level(3) Nashville (Sidco Drive) (8.2 miles, 4 networks); EdgeConneX Nashville (EDCNAS01) (8.5 miles, 5 networks); H5 Data Centers Nashville (TN01) (12 miles, 3 networks).
More datacenters and hubs in Tennessee
About this data
Source: PNNL datacenter atlas and OpenStreetMap facility records, deduplicated by GridCensus, as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “HCA Information Technology & Services Data Center, TN”, https://gridcensus.com/datacenters/hca-information-technology-services-data-center-6949522d (data as of July 9, 2026).
Dataset updated . Screening estimates derived from public data sources.
Capacity and footprint are catalogued figures from public facility records and may lag operational changes.
Go deeper than the public screen
Every site and score for HCA Information Technology & Services Data Center, TN is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.