Google Lenoir
DatacenteractiveLenoir, NC · Google
At a glance
Google Lenoir is a hyperscale datacenter at 801 Main Street NW, Lenoir, NC. It is operated by Google. Among the best-connected interconnection facilities in the area, the closest is 801 Main Street - Lenoir, 0.6 miles away, with 1 connected network.
Who operates Google Lenoir?
Google Lenoir is operated by Google. In the GridCensus catalog Google is listed at 94 US datacenters in 16 states, 2 of them in North Carolina. The operators with the most facilities in North Carolina are Meta (4), Flexential (3), Digital Realty (2).
Where is Google Lenoir located?
The facility's recorded address is 801 Main Street NW, Lenoir, NC. It is one of 2 datacenters catalogued in Lenoir. North Carolina has 41 catalogued datacenters, the 17th-most of any state. The largest clusters in the state are Charlotte (8), Durham (5), Raleigh (5).
What network and power infrastructure is near Google Lenoir?
1 PeeringDB interconnection facility is listed in the surrounding area; of those, the closest is 801 Main Street - Lenoir, about 0.6 miles away. The best-connected of them, 801 Main Street - Lenoir, has 1 networks present, against a North Carolina median of 2 networks per facility. 5 other datacenters are listed in the surrounding area (within about half a degree of latitude and longitude). The highest-scoring candidate site nearby is UNKNOWN111144 in Caldwell County, with a DC Readiness score of 65.6 out of 100 and a 230 kV substation nearby.
Nearby internet exchanges
- 801 Main Street - LenoirLenoir, NC · 1 networks
Other datacenters nearby
Nearby datacenter candidate sites
Scored candidate sites near Google Lenoir, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN111144 | Substation-Adjacent | NC | Caldwell County | 230 kV | 300 MW | 5.3 yrs | 65.6 |
| TAP152593 | Substation-Adjacent | NC | Caldwell County | 230 kV | 300 MW | 5.3 yrs | 65.5 |
| UNKNOWN111141 | Substation-Adjacent | NC | Caldwell County | 230 kV | 300 MW | 5.3 yrs | 65.2 |
| LONGVIEW | Substation-Adjacent | NC | Catawba County | 230 kV | 300 MW | 5.3 yrs | 63.4 |
| OZ Caldwell | Greenfield | NC | Caldwell | — | — | 5.3 yrs | 63.0 |
| UNKNOWN110586 | Substation-Adjacent | NC | Ashe County | 230 kV | 300 MW | 5.3 yrs | 61.9 |
| EC Near Maiden Finger Street | Greenfield | NC | Catawba | — | — | 5.3 yrs | 60.6 |
| OZ Watauga | Greenfield | NC | Watauga | — | — | 5.3 yrs | 60.1 |
See something wrong or out of date?
Frequently asked questions
Who owns or operates Google Lenoir?
Google Lenoir is operated by Google. Google runs 94 datacenters in the GridCensus catalog across 16 states. Ownership of the building itself can differ from the operator; the operator is the company running the facility.
What is the address of Google Lenoir?
Google Lenoir is located at 801 Main Street NW, Lenoir, NC. Its coordinates are 35.9137, -81.5390.
Which internet exchanges and carrier hotels are near Google Lenoir?
GridCensus lists 1 PeeringDB interconnection facility near Google Lenoir: 801 Main Street - Lenoir (0.6 miles, 1 networks).
What type of datacenter is Google Lenoir?
Google Lenoir is classified as a hyperscale facility — a large campus building operated by a cloud or internet company for its own workloads.
More datacenters and hubs in North Carolina
About this data
Source: PNNL datacenter atlas and OpenStreetMap facility records, deduplicated by GridCensus, as published March 6, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Google Lenoir, Lenoir, NC”, https://gridcensus.com/datacenters/google-lenoir-78afd4dc (data as of March 6, 2026).
Dataset updated . Screening estimates derived from public data sources.
Capacity and footprint are catalogued figures from public facility records and may lag operational changes.
Go deeper than the public screen
Every site and score for Google Lenoir, Lenoir, NC is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.