Facebook Fort Worth Datacenter
DatacenteractiveFort Worth, TX · Meta
Facebook Fort Worth Datacenter is an operating datacenter facility in Fort Worth, TX, operated by Meta. It spans approximately 634,395 square feet. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Location
Nearby internet exchanges
- Equinix DA1 - DallasDallas, TX · 168 networks
- Equinix DA3 - DallasDallas, TX · 104 networks
- Equinix DA6 - DallasDallas, TX · 77 networks
- Digital Realty DFW (2323 Bryan St)Dallas, TX · 61 networks
- Equinix DA - Dallas (previously Infomart Dallas)Dallas, TX · 58 networks
Other datacenters nearby
- Facebook Fort Worth DatacenterMeta · TX
- Facebook Fort Worth DatacenterMeta · TX
- DataBank Plano Data CenterDataBank, Ltd. · Plano, TX
- Cyxtera Dallas-Fort Worth Data CenterCyxtera · Fort Worth, TX
- QTS Irving - Dallas Data Center CampusQuality Technology Services · TX
Nearby datacenter candidate sites
Scored candidate sites near Facebook Fort Worth Datacenter, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| EAGLE MOUNTAIN | Substation-Adjacent | TX | Tarrant County | 345 kV | 600 MW | 3.4 yrs | 77.0 |
| HICKS | Substation-Adjacent | TX | Tarrant County | 345 kV | 600 MW | 3.4 yrs | 75.1 |
| NORTHWEST CARROLLTON | Substation-Adjacent | TX | Dallas County | 345 kV | 600 MW | 3.4 yrs | 75.0 |
| NORWOOD | Substation-Adjacent | TX | Dallas County | 345 kV | 600 MW | 3.4 yrs | 74.5 |
| UNKNOWN308533 | Substation-Adjacent | TX | Tarrant County | 345 kV | 600 MW | 3.4 yrs | 74.0 |
| SHERRY | Substation-Adjacent | TX | Tarrant County | 345 kV | 600 MW | 3.4 yrs | 74.0 |
| UNKNOWN301121 | Substation-Adjacent | TX | Tarrant County | 345 kV | 600 MW | 3.4 yrs | 73.9 |
| UNKNOWN302319 | Substation-Adjacent | TX | Tarrant County | 345 kV | 600 MW | 3.4 yrs | 73.9 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Facebook Fort Worth Datacenter, Fort Worth, TX. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.