UNKNOWN108786

Substation-Adjacent

Wetzel, West Virginia · PJM

DC Readiness
57.2
Good / 100

UNKNOWN108786 is a substation-adjacent datacenter candidate site in Wetzel, West Virginia, interconnecting through PJM. It screens at 57.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN108786
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityCITY OF NEW MARTINSVILLE - (WV)not available

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth130
Avg queue wait3.8 yrs

Connectivity

Nearest IXPCitynet Bridgeport
IXP distance41.2 mi
Fiber providers4
Fiber coverage44.5%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterCitynet Bridgeport
DC distance41.2 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity11.24¢/kWh
Industrial electricity7.59¢/kWh
Cooling degree days800
Heating degree days5,000
Land price / acre$2,290

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN108786

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
51
Fiber connectivity12%
61
Energy cost10%
50
Water risk7%
92
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
85

Nearby comparable sites

Other scored datacenter candidate sites in Wetzel, ranked by DC Readiness.

Sites near UNKNOWN108786
SiteTypeVoltageCapacityQueue waitScore
EC Coal Wetzel CountyGreenfield3.0 yrs58.6
UNKNOWN108769Substation-Adjacent138 kV100 MW3.8 yrs58.5
EC FFE Wetzel CountyGreenfield3.0 yrs58.4
UNKNOWN140085Substation-Adjacent138 kV100 MW3.8 yrs58.3
TAP136884Substation-Adjacent138 kV100 MW3.8 yrs57.1
EC Coal Wetzel CountyGreenfield3.0 yrs56.5
OZ WetzelGreenfield3.0 yrs51.9
Mine SiteFormer Mine3.8 yrs51.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.