UNKNOWN151004

Substation-Adjacent

Ohio County, West Virginia · PJM

DC Readiness
54.6
Fair / 100

UNKNOWN151004 is a substation-adjacent datacenter candidate site in Ohio County, West Virginia, interconnecting through PJM. It screens at 54.6/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN151004
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth130
Avg queue wait3.8 yrs

Connectivity

Nearest IXPDataBank Pittsburgh (PIT2)
IXP distance33.2 mi
Fiber providers5
Fiber coverage36.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterDataBank Pittsburgh PIT2
DC distance33.2 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity11.76¢/kWh
Industrial electricity7.39¢/kWh
Cooling degree days800
Heating degree days5,000
Land price / acre$4,459

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN151004

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
51
Fiber connectivity12%
60
Energy cost10%
50
Water risk7%
92
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
85

Nearby comparable sites

Other scored datacenter candidate sites in Ohio County, ranked by DC Readiness.

Sites near UNKNOWN151004
SiteTypeVoltageCapacityQueue waitScore
EC Coal Ohio CountyGreenfield——3.0 yrs60.3
OZ OhioGreenfield——3.0 yrs60.1
EC Coal Ohio CountyGreenfield——3.0 yrs59.0
UNKNOWN150364Substation-Adjacent138 kV100 MW3.8 yrs57.7
TAP150363Substation-Adjacent138 kV100 MW3.8 yrs57.7
TAP150359Substation-Adjacent138 kV100 MW3.8 yrs57.4
EC Coal Ohio CountyGreenfield——3.0 yrs57.3
BRUESSubstation-Adjacent138 kV100 MW3.8 yrs57.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.